- Product Details
- {{item.text}}
Quick Details
-
Year:
-
2024, 2024
-
Power (kW):
-
75 kW
-
Weight (KG):
-
5200 KG, 5200
-
Name:
-
Small tire recycling line
-
Condition::
-
new
-
Power (kW)::
-
45KW+3KW+20KW+28KW
-
Dimension(L*W*H)::
-
5600*2800*2800MM
-
Voltage::
-
220V\380V
-
Application::
-
tire cutting machine to shredded rubber
-
Usage::
-
truck tire sidewall cutting machine
Quick Details
-
Place of Origin:
-
Henan China
-
Brand Name:
-
WEREDE, WEREDE
-
Voltage:
-
Customized according to customer needs
-
Year:
-
2024, 2024
-
Power (kW):
-
75 kW
-
Weight (KG):
-
5200 KG, 5200
-
Name:
-
Small tire recycling line
-
Condition::
-
new
-
Power (kW)::
-
45KW+3KW+20KW+28KW
-
Dimension(L*W*H)::
-
5600*2800*2800MM
-
Voltage::
-
220V\380V
-
Application::
-
tire cutting machine to shredded rubber
-
Usage::
-
truck tire sidewall cutting machine
Henan Weiride Machinery Equipment Co., Ltd. launched a small tire recycling machine, which can process bicycle tires,
motorcycle tires, electric tires, truck tires into pellets or rubber powder within 40 mesh, a full set of equipment including
tire cutting machine, tire grinding host, screening machine, magnetic separator, etc., this equipment can reach 500kg
rubber powder production capacity per hour.
name | motor power | weight | voltage |
Small tire recycling line | 75kw | 5200kg | customizable |
A full set of equipment can be combined according to actual needs, and you can contact customer service to customize your tire recycling line |
1. Q: Are you a factory or a trading company?
We are a professional production enterprise company with more than 20 years of production experience.
2.Q: How does your factory do in terms of quality control?
A: "Quality first." We always attach great importance to quality control from start to finish.
3.Q: What is your minimum order quantity?
Any quantity of your order is acceptable. The price is negotiable for large quantities
4.a: We are a factory with more than 20 years of experience
Factory address: No.6 Gongyi Industrial Incubator, Henan, China
You are welcome to visit our factory and we will arrange your trip and book your hotel.
5.Q: When is your delivery date?
Answer: The production cycle of different equipment is different, usually 3-20 days. Please consult our sales team for details.
6.Q: What are your payment terms?
A: Pay 30% telegraphic transfer deposit in advance and the remaining 70% before shipment.
1). package: Wrap in protective film; Packed in standard import and export wooden cases or cartons.
2). transport: Shipping: through logistics; By car; Take the train; By sea; By air, etc.