Products
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock
YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock

YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock

FOB Reference Price: Get Latest Price
≥2 Pieces
US $6
≥100 Pieces
US $5.8
≥1000 Pieces
US $5.7
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Type:
Round Harden Steel Hockey Puck Lock
Material:
Steel
MOQ:
2pcs
Surface treatment:
Chrome plated
Size:
73mm
Weight:
2kg
Samples:
Availabe
Package:
White box or blister
Certification:
ISO9001:2008

Quick Details

Place of Origin:
Zhejiang, China, Zhejiang, China
Brand Name:
/
Model Number:
YH9600
Type:
Round Harden Steel Hockey Puck Lock
Material:
Steel
MOQ:
2pcs
Surface treatment:
Chrome plated
Size:
73mm
Weight:
2kg
Samples:
Availabe
Package:
White box or blister
Certification:
ISO9001:2008

YH9600 73mm High quality harden heavy duty Round Harden Steel Hockey Puck Lock with Bolt Heavy Duty Van Garage Shed Door Padlock

Products Model

YH9600

Type

Round Harden Steel Hockey Puck Lock

Material

Iron+ Zinc Alloy

Weight

2kg

Structure Function

Trailer parts

MOQ

2PCS

Place of origin

Zhejiang China

Certification

ISO9001:2008

Port

Ningbo or Shanghai or Guandong and so on.

Packing

20pcs in a carton,carton size:26.5X17X16cm

Production lead time

Normally around 30 days after sample confirmed

1. Q: How To Order ?
A:
Step 1, please tell us what model and quantity you need;
Step 2, then we will make a PI for you to confirm the order details;
Step 3, when we confirmed everything, can arrange the payment;
Step 4, finally we deliver the goods within the stipulated time.

2 .Q: When will make delivery ?
A:
Delivery Time
Sample Order: 1-3 days after receipt of the full payment.
Stock Order: 3-7 days after receipt of the full payment
OEM Order: 15-30 days after receipt of the deposit.

3. Q: How can i get a sample with my logo?
A:
Please send us the logo artwork,sample and logo cost will be paid by you.

4. Q: How does your factory do regarding quality control?
A:
Quality is priority. our workers always attach great importance to quality control from the very beginning to the very end. each products will be inspected before packing.

5. Payment T/T, Western Union, Moneygram ,Escrow.

6. Transportation Transported by DHL, UPS, EMS, Fedex,Air freight. sea freight.

APP
Post My RFQ
WhatsApp
+86-17326049340