Explore More Products
- Product Details
- {{item.text}}
Quick Details
-
Product name:
-
Projector Screen Cabinet Electric Meter Box Metal Enclosure
-
Material:
-
Steel,Stainless steel,AL,Brass
-
Thickness:
-
0.1~25mm
-
Packing:
-
Poly Bag + Inner Box + Carton
-
MOQ:
-
100pcs
-
Service:
-
OEM or ODM
-
Finish:
-
Polishing, Anodic oxidation, powder coating, Nickel plated, Galvanized
-
Precision:
-
+/-0.02mm
-
Drawing Format:
-
3D/CAD/DWG//STEP/PDF
-
Size:
-
custom
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
qiandun
-
Model Number:
-
Elosure BoxXY47
-
Product name:
-
Projector Screen Cabinet Electric Meter Box Metal Enclosure
-
Material:
-
Steel,Stainless steel,AL,Brass
-
Thickness:
-
0.1~25mm
-
Packing:
-
Poly Bag + Inner Box + Carton
-
MOQ:
-
100pcs
-
Service:
-
OEM or ODM
-
Finish:
-
Polishing, Anodic oxidation, powder coating, Nickel plated, Galvanized
-
Precision:
-
+/-0.02mm
-
Drawing Format:
-
3D/CAD/DWG//STEP/PDF
-
Size:
-
custom
Material
|
SPCC,SECC,SGCC,Stainless steel,Aluminum,Brass,etc
|
|
|
|
|||
Thickness
|
0.2mm to 25mm depend on different material
|
|
|
|
|||
Surface Treatment
|
Powder coating,Zinc plating,Nickel plating,Anodic oxidation,Silkscreen,Polishing,etc
|
|
|
|
|||
Service mode
|
OEM or ODM
|
|
|
|
|||
Certificate
|
ISO9001
|
|
|
|
|||
Drawings format
|
PDF,CAD,STEP,SOLID
|
|
|
|
|||
Sample Lead Time
|
2-7 days
|
|
|
|
|||
Processing procedure
|
Laser cutting, Bending, Reviting, Welding, Polishing, Assembly
|
|
|
|
1.How can I get a quotation?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information.
2.What is the process to place the order?
(1).send us the drawing to get a free quatation.
(2).we will make a sample for you to check the quality.
(3).batch production will be proceed after sample is qualified and our service is accepted.
3.The surface treatment type we can handle?
power coating, paint, polish, brushed, galvanized, anodized, sand blasting.
4.How do you control the quality?
(1) Material inspection--Check the material surface and roughly dimension.
(2) Production first
inspection--To ensure the critical dimension in mass production.
inspection--To ensure the critical dimension in mass production.
(3) Sampling inspection--Check the quality before sending to the
warehouse.
warehouse.
(4) Pre-shipment inspection--100% inspected by QC assistants before shipment.
5. How about the lead time?
Generally, 1-2 weeks for samples, 3-4 weeks for mass production.
Verified information
This information was Verified by and is valid for the following period: 2022-12-1 --- 2023-11-30
The information below covers both the Gold Supplier and its related companies, which are defined according to china laws and regulations, and which will also be clearly displayed in the
full report >>
Hot Searches