- Product Details
- {{item.text}}
Quick Details
-
Lifespan (hours):
-
100000
-
Working Time (hours):
-
100000
-
Product Weight(kg):
-
50
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
SJ-3D-060
-
Working Temperature(℃):
-
-40+60
-
Lamp Luminous Flux(lm):
-
200ML
-
Working Lifetime(Hour):
-
50000H
-
Input Voltage(V):
-
24V-265V(optional)
-
IP Rating:
-
IP65
-
Rated Power:
-
50W~200W(optional)
-
Waterproofing grade:
-
IP65
-
Voltage:
-
24V-265V(optional)
-
Certificate:
-
CE/RoHS/SAA/CCC/PSE
-
Working Temperature:
-
(-40-60℃)
-
Usage:
-
Garden, landscape, park, square, bar, villa, street, lighting show
-
Size:
-
1.5M/2M/3M/3.5M/4.5M/6M/7M/8M(optional)
-
Holiday name:
-
Christmas/ Halloween/wedding/all kinds of celebrations
-
Item Name:
-
led 3d deer motif light
Quick Details
-
Color Temperature(CCT):
-
2700K (Soft Warm White)
-
Application:
-
Commercial Use, Home Decoration, LANDSCAPE
-
Material:
-
ABS, Other
-
Lifespan (hours):
-
100000
-
Working Time (hours):
-
100000
-
Product Weight(kg):
-
50
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
SJ-3D-060
-
Working Temperature(℃):
-
-40+60
-
Lamp Luminous Flux(lm):
-
200ML
-
Working Lifetime(Hour):
-
50000H
-
Input Voltage(V):
-
24V-265V(optional)
-
IP Rating:
-
IP65
-
Rated Power:
-
50W~200W(optional)
-
Waterproofing grade:
-
IP65
-
Voltage:
-
24V-265V(optional)
-
Certificate:
-
CE/RoHS/SAA/CCC/PSE
-
Working Temperature:
-
(-40-60℃)
-
Usage:
-
Garden, landscape, park, square, bar, villa, street, lighting show
-
Size:
-
1.5M/2M/3M/3.5M/4.5M/6M/7M/8M(optional)
-
Holiday name:
-
Christmas/ Halloween/wedding/all kinds of celebrations
-
Item Name:
-
led 3d deer motif light
led pumpkin cart for Outdoor Christmas 3D Supermarket decoration christmas with motif light
Product Information | |
Product model | SJ-3D-060 |
Brand Name: |
SHENG JIA |
APP |
Garden, landscape, park, square, bar, villa, street, lighting show etc. Different ceremonies and holidays |
product standard | 1.5M/2M/3M/3.5M/4.5M/6M/7M/8M(optional) |
Certificate |
CE/RoHS/SAA/CCC/PSE |
Working Temperature | (-40-60℃) |
Voltage | 24V/110V/220V/230V (optional) |
Qty of Led | 4800pcs (optional) |
Flower Material: | Environment PVC |
Material: | Resin, Steel tube, environmental PE, PVC |
Colors | Red, yellow, green, blue, white, pink, purple, warm white or color-changing (optional) |
Wire | 100% Copper wire |
Delivery Terms | EXW; FOB Guangzhou, Shenzhen, or Hongkong |
Payment Terms | 30% advance payment as deposit before production, the balance should be paid before delivery by Western Union or T/T. |
Delivery Time | 3~10 Days |
1,IP65 waterproof ,, safe use in the outdoor and indoor
2,Working temperature:-40-60 degree Celsius.Suitable for any weather on earth.
3,100% pure copper hardy PVC wire.
4,Taiwai Epistar led chip
5,Transformer made in Japan,waterproof and ,stand wear and tear.
6, Application : :garden,hotel,bar,home,school,yard,square,villa,road Christmas day and other festive etc.
1. Specialized in LED tree lights for years,,Shengjia is the one of largest manufacturer in China .
2. Reasonable price :o ur price is competitively under the same quality conditions.
3. full y consider ing to the buyer local weather, we can make special treatment for products
4. We guarantee, our warranty time is 2 years, we'll provide new branch or parts to you if any problem during this period of time.
5. Shortest lead time if be of our agent, usually takes a week to delivery 20 HQ container goods.
6.Best before and after sales service, your inquiry related to our products or prices will be replied in 12 hrs.
7. OEM&ODM, any your customized led tree lights or decoration lights we can help you to design and put into product
8. We implement the ISO9000 quality management system, has passed CE ,Fcc and RoHS certificatio
9. We can be customized according to customer's requirements, different size, the price will be adjusted.
1. Payment: T/T only 30% deposits before production, 70% balance to be paid before deliver,
Western Union , L/C or Cash/paypal/HSBC HongKong bank are welcomed
2. Delivery method: FOB shenzhen or Guangzhou CIF, CFR, EXW
3. Production Lead Time for 100 -1000 pcs: 7-15 days
4. Sample can be delivered in 5 days
5. Discounts are offered based on order quantities
6. MOQ: 1 piece
Q: What about installation, is difficult?
A: Simple install, all complicate part have be settled before delivery, in normal condition 20 minute to complete installation.
Q: Do need professional electrician to install?
A: Customer can install product follow installation manual. But still recommend to have qualified electrician to proceed the installation.
Q: what about the malfunction rate, if one LED bulb broken, is that all LED bulbs shut down?
A: Malfunction rate is low, less < 0.5%. All tree brunch be specified designed by individual circuit, one LED bulb black out doesn't effect other LED work, the rest of LED bulb will lighting as well.
How to contact us?
Send you inquiry details in the Below, Click‘ send ’ Now!