- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Outdoor
-
Design Style:
-
Modern
-
Type:
-
steel prop
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
SCTSL, SCTSL
-
Model Number:
-
Scaffolding
-
Wall thickness:
-
1.5-3mm
-
Diameter of steel prop:
-
48mm,56mm,60mm etc
-
lock pin of steel prop:
-
G type or straight
-
Surface treatment:
-
Hot Dip Galvanized, Painted, Electroplate
-
Package:
-
In bundle or in bulk
-
Product name:
-
adjustable props
-
Diameter:
-
40mm,48mm etc
-
plate:
-
Square or flower plate
-
Color:
-
Silver or as your need
Quick Details
-
Warranty:
-
1 Year
-
After-sale Service:
-
Online technical support
-
Project Solution Capability:
-
graphic design, 3D model design
-
Application:
-
Outdoor
-
Design Style:
-
Modern
-
Type:
-
steel prop
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
SCTSL, SCTSL
-
Model Number:
-
Scaffolding
-
Wall thickness:
-
1.5-3mm
-
Diameter of steel prop:
-
48mm,56mm,60mm etc
-
lock pin of steel prop:
-
G type or straight
-
Surface treatment:
-
Hot Dip Galvanized, Painted, Electroplate
-
Package:
-
In bundle or in bulk
-
Product name:
-
adjustable props
-
Diameter:
-
40mm,48mm etc
-
plate:
-
Square or flower plate
-
Color:
-
Silver or as your need
MIN
|
MAX
|
INTERNAL TUBE (mm)
|
EXTERNAL TUBE (mm)
|
1.7m
|
3.0m
|
48*1.8/2/2.5
|
60*1.8/2/2.5
|
2.0m
|
3.5m
|
48*1.8/2/2.5
|
60*1.8/2/2.5
|
2.2m
|
4.0m
|
48*/2/2.5/3
|
60*/2/2.5/3
|
2.5m
|
4.5m
|
48*/2/2.5/3
|
60*/2/2.5/3
|
3.0m
|
5.0m
|
48*/2/2.5/3
|
60*/2/2.5/3
|
MIN
|
MAX
|
INTERNAL TUBE (mm)
|
EXTERNAL TUBE (mm)
|
1.7m
|
3.0m
|
40*1.5/1.8/2
|
48*1.5/1.8/2
|
|
|
48*1.5/1.8/2
|
56*1.5/1.8/2
|
2.0m
|
3.5m
|
40*/1.8/2/2.5
|
48*1.8/2/2.5
|
|
|
48*1.8/2/2.5
|
56*1.8/2/2.5
|
2.2m
|
4.0m
|
40*/1.8/2/2.5
|
48*1.8/2/2.5
|
|
|
48*/1.8/2/2.5
|
56*1.8/2/2.5
|
2.5m
|
4.5m
|
40*/1.8/2/2.5
|
48*1.8/2/2.5
|
|
|
48*/1.8/2/2.5
|
56*1.8/2/2.5
|
3.0m
|
5.0m
|
40*2/2.5/3
|
48*2/2.5/3
|
|
|
48*2/2.5/3
|
56*2/2.5/3
|
Feature:
1.
Shoring jack heavy duty adjustable shoring posts shoring light duty formwork steel shoring prop for construction scaffolding
2.Widely used in construction, stage, concrete formwork, tunnel, demolition, commercial industry, bridge road, airport, oil and gas,shipping, oil and other industries.
2.Widely used in construction, stage, concrete formwork, tunnel, demolition, commercial industry, bridge road, airport, oil and gas,shipping, oil and other industries.
3.Scaffolding props
are used as a temporary support for concrete formwork shuttering work, called acrow props, shoring jacks,scaffolding poles etc.
FAQ
Q1: Are you a manufacturer?
A: Yes,we have specialized in this field for about 12 years experience.
Q2: Could you provide sample?
A: Yes,we can provide sample together with our catalogue.
Q3: What information should I provide,if I want a lowest quotation?
A: The specifications of wire diameter. length, quantity, packing, etc.
Q4: How does your factory do regarding quality control?
A: We are very proud to let you know that, we use the best raw material,have at least 5 years experienced workers, the advanced
machine and specialized team to assure the quality.
We perform Quality Control Inspections on 100%of our products.
Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Q6:Whats the payment term?
A: We usually use the T/T,L/C,D/P,Western union.
A: Yes,we have specialized in this field for about 12 years experience.
Q2: Could you provide sample?
A: Yes,we can provide sample together with our catalogue.
Q3: What information should I provide,if I want a lowest quotation?
A: The specifications of wire diameter. length, quantity, packing, etc.
Q4: How does your factory do regarding quality control?
A: We are very proud to let you know that, we use the best raw material,have at least 5 years experienced workers, the advanced
machine and specialized team to assure the quality.
We perform Quality Control Inspections on 100%of our products.
Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Q6:Whats the payment term?
A: We usually use the T/T,L/C,D/P,Western union.
Hot Searches