- Product Details
- {{item.text}}
Quick Details
-
Voltage:
-
Local Requirement
-
Power:
-
2.2kw-18kw
-
Weight:
-
240kg
-
Dimension(L*W*H):
-
1200mm*1600mm*1900mm
-
Processing Types:
-
Beer keg
-
Warranty:
-
2 Years
-
Certification:
-
ISO ,CE ,SGS
-
sus304 beer keg washer:
-
keg washing and filling machine
-
Automatic beer keg washing and filling:
-
sliver keg washing and filling
Quick Details
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
Kegco ----beer keg washing and filling machine
-
Model Number:
-
Two head ----beer keg washing and filling machine
-
Voltage:
-
Local Requirement
-
Power:
-
2.2kw-18kw
-
Weight:
-
240kg
-
Dimension(L*W*H):
-
1200mm*1600mm*1900mm
-
Processing Types:
-
Beer keg
-
Warranty:
-
2 Years
-
Certification:
-
ISO ,CE ,SGS
-
sus304 beer keg washer:
-
keg washing and filling machine
-
Automatic beer keg washing and filling:
-
sliver keg washing and filling
Product Application
Beer keg filling and washing and filling machine
Kegco is a world wide supplier and manufacture for stainless steel beer keg ,keg filling and washing machine ,keg accessories ,brewing equipment ...
Main Features
1) Simple structure in linear type ,easy in installation and maintation.
2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts.
3) Running in a high automatization and intellectualization,easy to operate
4) Apply a linker to connect with the air conveyor ,which can directly inline with filling machine .
1.SIEMENS S7-200 control unit is adopted for automatic control of all processes. Washing, disinfecting and CO2 pressure preparation will be automatically finished.
2.lye water, disinfecting water can be recycled to save water.
3.Adopt pneumatic angle vale combination to ensure a safe work.
4.Frame, working station, pipeline and valves are all by stainless steel, all pipelines and pneumatic system are all closed cycle. Good look and stable.
5.Time parameters can be adjusted according to customers’ demands. If a procedure is not needed, you can turn the time parameter of this procedure to “0”.
The Washing working procedure
Pressing → drain off → water washing → air blowing/drain off → hot soda-water washing → air blowing/to soda-water box → hot water washing →air blowing/drain off → hot water washing → drain off → steam sterilized (air blowing/drain off) →co2 blowing/drain off→ sterilized water washing →co2 blowing/to water tank→ co2 pressure preparing
The filler working procedure
Load the keg → Pressing → co2 pressure preparing → CO2 blowing spear → open the spear → filling → stop → unload the keg
CIP procedures at filling position:
Install washing accessory → start → spear cylinder open → time’s up → stop