- Product Details
- {{item.text}}
Quick Details
-
Material:
-
Metal
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
1038-1
-
Feature:
-
modern,strong,durable,comfortable
-
Function:
-
school chair
-
Foam:
-
high density new foam
-
Board:
-
pressed wood
-
Armrest:
-
powder coated metal frame no padding
-
Legs:
-
metal
-
Seat:
-
fabric finish+foam+plywood
-
Back:
-
fabric finish+foam+plywood
-
Color:
-
red
-
Volume:
-
0.07cbm/pc
Quick Details
-
Mail packing:
-
N
-
Application:
-
Home Office, Office Building, Hospital, School
-
Design Style:
-
Modern
-
Material:
-
Metal
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
1038-1
-
Feature:
-
modern,strong,durable,comfortable
-
Function:
-
school chair
-
Foam:
-
high density new foam
-
Board:
-
pressed wood
-
Armrest:
-
powder coated metal frame no padding
-
Legs:
-
metal
-
Seat:
-
fabric finish+foam+plywood
-
Back:
-
fabric finish+foam+plywood
-
Color:
-
red
-
Volume:
-
0.07cbm/pc
High Quality School Furniture Chair Red Fabric Library Reading Chair
High quality commercial furniture.
Safe
material and ultra
durable
.
Description
-Item Specifics
--Condition
New, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging is handmade or was packaged by the manufacturer in non-retail packaging, such as an unprinted box or in detailed packaging regarding customer’s marks.
--Room: Office/Home
--Type: No Wheels Chair
--Color: Red
--Material: YIDAR Fabric
--Total Height: Mid Back = 85cm
--Seat Width: 46cm
--Chair Width: 50cm
--Seat Depth: 56cm
--Chair Depth: 60cm
Payment and Lead Time Information
Payment
--Sample Payment: By T/T, 100% payment before production. Seller will charge Double Sample Payment in the first order, but will refund 1/2 additional money to buyer when buyer place full container in the following cooperation.
--Trial Order & Full Containers Order: By T/T, 30% deposit before production and 70% balance before loading.
Lead Time
--Sample lead time: 10-15 business days upon receipt of official PO.
--Trial order lead time: 20-30 business days upon receipt of official PO.
--Mass production lead time: 30-45 business days upon receipt of official PO.
*Trial order includes MOQ or quantity less than one full container. Mass production means the quantity is more than one 40’HQ but less than three containers. If you purchase more than three containers, the lead time will be longer than 45 business days.