- Product Details
- {{item.text}}
Quick Details
-
EINECS No.:
-
other
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Dhkchem
-
Model Number:
-
SPUA-DHK3100
-
Appearance:
-
liquid
Quick Details
-
CAS No.:
-
none
-
Other Names:
-
spray polyurea coating
-
MF:
-
other
-
EINECS No.:
-
other
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Dhkchem
-
Model Number:
-
SPUA-DHK3100
-
Appearance:
-
liquid
Spray polyurea coating SPUA-DHK3100
SPUA-DHK3100 is a 100% solid, fast set, spray-applied, two component aromatic polyurea elastomer. The system consists of the A
component, a quasi-prepolymer rich of free NCO, and the B component, a mixture of polyetheramine, amine extenders and other
additives. The unique polyurea chemistry allows this material to be tolerant of moisture and lower temperatures during
application. This means that high humidity and hidden moisture in concrete has minimal effect on the application of this product.
* Fast cure, short downtime but non-sagging.
* Moisture and temperature insensitivity during processing.
* High thermal stability.
* 100% solid, Non-VOC and odorless, environmental friendly.
* Extraordinary physical properties.
* Excellent adhesion to primed concrete.
* Seamless, flexible and waterproof.
* High elongation properties, resistance to freeze-thaw.
* Superior weather resistance.
* No chalking and fading in long-term outdoor use.
2. Application
Designed for use as a smooth seamless waterproof lining coating system for interior and a roof and wall coating system for
exterior applications. Ideally suitable for use in areas including:
Metal, concrete, wood and foam roofing.
* Mechanical rooms.
* Cold storage areas.
* Basing and reservoirs.
* Marine bridges.
* Tunnels.
* Underground engineering.
* Cooling towers of power plants.
* Aquarium lining.
* Pond lining.
* Water and waste water linings.
3. Technical data
No.
|
Item
|
Index
|
|
|
|
|
I
|
II
|
|
1
|
Color
|
Optional
|
|
|
2
|
Solid
|
100%
|
|
|
3
|
Gel time
|
10 seconds
|
|
|
4
|
Mixing ratio(by volume)
|
1:1
|
|
|
5
|
Flash point
|
>200°C
|
|
|
6
|
Recommended spreading thickness
|
1-2mm
|
|
|
7
|
Drying time
|
Temperature, humidity and film thickness dependent
|
|
4. Performance characteristics
No.
|
Item
|
Specification
|
|
|
1
|
Flash point
|
>200°C
|
|
|
2
|
Tensile strength
|
15Mpa
|
21Mpa
|
|
3
|
Tensile elongation
|
350%
|
520%
|
|
4
|
Tear strength
|
59 KN/m
|
78 KN/m
|
|
5
|
Impact resistance
|
1.5Kg·m
|
1.5Kg·m
|
|
6
|
Adhesion
|
2.6Mpa
|
2.6Mpa
|
|
7
|
Hardness
|
Shore A85-95
|
Shore A80-90
|
|
8
|
Water impermeability,
0.4Mpa×2h
|
Impermeable
|
|
|
9
|
Specific gravity
|
1.02g/cm3
|
1.02g/cm3
|
|
10
|
Service temperature
|
-50°C-150°C
|
|
5. Recommended Primers
Concrete
SPUA-DHK400 sealing primer @8-10sqm/ kg per coat
Others: contact us for a recommendation
6. Packing
Part A: 220kg /drum
Part B: 200kg/drum
7. Storage condition
* A component is easily affected by moisture must be protected from moisture contamination. Containers are factory sealed with an
inert gas to prevent contamination. Keep all containers tightly closed during storage. For further storage after opening,
containers must be purged with nitrogen gas or dry air and tightly sealed from moisture.
* Store drums and pails in a cold, dry and ventilated location between 15-40°C.
* Keep away from rain and sunshine.
* Keep away from fire and heat source.
*
8. Installation instruction
a. Surface preparation
Surface must be properly prepared. Remove all oil, dust, grease, dirt etc to ensure adequate adhesion.
b. Application condition
Temperature:
Air and surface: -20°C-40°C
Relative humidity: ≤90%
c. Equipment (For example)
Plural component heated spray equipment (required)
Equipment…………………………………………Gusmer H-20/35
Gun………………………………………………….GX7 DI, GX7-400, or GX-8 etc
Fluid pressure…………………………………….50—60kg/cm2
Air pressure……………………………………….≥7kg/cm2
Inlet strainer screen……………………………...30 mesh
Gun screen…………………………………………80 mesh
Heaters and heated hose………………………..65°C
Mix ratio…………………………………………….1:1
*If specific application equipment is listed above, equivalent equipment can be substituted. Contact us for specific information.
d. Cure time
Surface dry (25°C) ≤1 minute
Inside dry (25°C) ≤1 minute
Recoat time: Minimum unlimited
Maximum ≤3hours
*Due to rapid cross-linking, recoating must be done as soon as the first coat is dry.
*If maximum recoat time is exceeded, abrade surface before recoating.
*Contact our technical team for recoat procedure.
9. Attention
Any thinner is not allowed.
Thoroughly mix container of B component with an air-driven power mixer for a minimum of 5 minutes prior to application.
Consult MSDS sheet before use. Contact us for additional technical data and instructions.
Concrete
SPUA-DHK400 sealing primer @8-10sqm/ kg per coat
Others: contact us for a recommendation
6. Packing
Part A: 220kg /drum
Part B: 200kg/drum
7. Storage condition
* A component is easily affected by moisture must be protected from moisture contamination. Containers are factory sealed with an
inert gas to prevent contamination. Keep all containers tightly closed during storage. For further storage after opening,
containers must be purged with nitrogen gas or dry air and tightly sealed from moisture.
* Store drums and pails in a cold, dry and ventilated location between 15-40°C.
* Keep away from rain and sunshine.
* Keep away from fire and heat source.
*
8. Installation instruction
a. Surface preparation
Surface must be properly prepared. Remove all oil, dust, grease, dirt etc to ensure adequate adhesion.
b. Application condition
Temperature:
Air and surface: -20°C-40°C
Relative humidity: ≤90%
c. Equipment (For example)
Plural component heated spray equipment (required)
Equipment…………………………………………Gusmer H-20/35
Gun………………………………………………….GX7 DI, GX7-400, or GX-8 etc
Fluid pressure…………………………………….50—60kg/cm2
Air pressure……………………………………….≥7kg/cm2
Inlet strainer screen……………………………...30 mesh
Gun screen…………………………………………80 mesh
Heaters and heated hose………………………..65°C
Mix ratio…………………………………………….1:1
*If specific application equipment is listed above, equivalent equipment can be substituted. Contact us for specific information.
d. Cure time
Surface dry (25°C) ≤1 minute
Inside dry (25°C) ≤1 minute
Recoat time: Minimum unlimited
Maximum ≤3hours
*Due to rapid cross-linking, recoating must be done as soon as the first coat is dry.
*If maximum recoat time is exceeded, abrade surface before recoating.
*Contact our technical team for recoat procedure.
9. Attention
Any thinner is not allowed.
Thoroughly mix container of B component with an air-driven power mixer for a minimum of 5 minutes prior to application.
Consult MSDS sheet before use. Contact us for additional technical data and instructions.
Part A: 220kg /drum
Part B: 200kg/drum
Part B: 200kg/drum
QINGDAO HENGKE FINE CHEMICALS CO., LTD is a chemical leading company, which combines researching, manufacturing and marketing into one body. The plant is located nearby the Qingdao Airport with very convenient transportation. Hengke has five divisions mainly engaged in Textile Auxiliaries, Food Additives, Oil Drilling & Water Treatment chemicals, Waterproof materials and Pharmaceutical intermediate to provide customers with all-around products and professional technical services.
With the concept "quality-first, integrity-based, innovative and efficient" we attempt to build DHKCHEM a famous brand and endeavor to make mutual benefit with all customers to realize our soul "ORDER US, RELAX YOUSELVES".
Hot Searches