- Product Details
- {{item.text}}
Quick Details
-
Application:
-
General Industry
-
Pipe clamps type:
-
Heavy Duty Pipe Clamp
-
Material::
-
Steel, EPDM-SBR Rubber
-
Temperature:
-
-50 to 110 °C
-
Pipe Size:
-
2Inch 60-65mm
-
Nut Size:
-
M8, M10
-
Width:
-
30 mm
-
Thickness:
-
2.5mm
Quick Details
-
Finish:
-
ZINC
-
Material:
-
Steel
-
Measurement system:
-
Imperial (Inch)
-
Application:
-
General Industry
-
Pipe clamps type:
-
Heavy Duty Pipe Clamp
-
Material::
-
Steel, EPDM-SBR Rubber
-
Temperature:
-
-50 to 110 °C
-
Pipe Size:
-
2Inch 60-65mm
-
Nut Size:
-
M8, M10
-
Width:
-
30 mm
-
Thickness:
-
2.5mm




Part Number
|
Pipe Size Range(mm)
|
Nut Model
|
Width* Thickness(mm)
|
|||
577033
|
14-18
|
M8 & M10
|
30X2.5
|
|||
577034
|
19-23
|
M8 & M10
|
30X2.5
|
|||
577035
|
24-28
|
M8 & M10
|
30X2.5
|
|||
577036
|
29-33
|
M8 & M10
|
30X2.5
|
|||
577037
|
33-37
|
M8 & M10
|
30X2.5
|
|||
577038
|
40-45
|
M8 & M10
|
30X2.5
|
|||
577039
|
47-52
|
M8 & M10
|
30X2.5
|
|||
577040
|
53-58
|
M8 & M10
|
30X2.5
|
|||
577041
|
60-65
|
M8 & M10
|
30X2.5
|
|||
* For more sizing information please contact the sales consultant
|
54-58
|
M 8/10
|
20X2.0
|
Features
:
* Fillet welded connector nut has flats to accommodate spanners * Flared steel band also suitable for plastic pipe *Pipe Size Range: 14-316mm.
* Fillet welded connector nut has flats to accommodate spanners * Flared steel band also suitable for plastic pipe *Pipe Size Range: 14-316mm.
*
Easy open flange for pipe sizes up to and including 4"
*Material: Galvanized Steel/EPDM Rubber (RoHs, SGS Certificated).
*Anti-Corrosion, Heat Resistance.
*Fast Delivery Time: Within 35 Days.
About the price:Due to the difference of models, please contact us for more detail
Combo head bolt works with slotted, hex, or Phillips drivers
Category II noise reduction according to DIN EN ISO 3822-1
Compliant for sound insulation design according to DIN 4109
Reaction-to-fire classification is "E" in compliance with DIN EN 13501-1:2010-01
Category II noise reduction according to DIN EN ISO 3822-1
Compliant for sound insulation design according to DIN 4109
Reaction-to-fire classification is "E" in compliance with DIN EN 13501-1:2010-01
Our Certification
FAQ
1.About Price:
Our prices are mostly based on EXW term with MOQ in normal package without marking. The price is negotiable which can be changed according to your order quantity. When you are making an inquiry, please let us know the quantity you want.
2.About Raw Material:
Galvanized Steel, EPDM rubber (both are RoHs, SGS certificated)
3.About Sample:
Samples are FREE, but please kindly bear the freight costs. We can help to choose the cheapest forwarder service for you. Those costs can be returned when you place the order.
4.About MOQ:
Our MOQ for the products are based on the mould models which can be 3,000pcs to 5,000pcs.
5.About OEM:
Welcome, you can send your own design drawings to us, our R&D Department will give the professional advises and make it into production.
6.About Customized Logo:
Welcome, It will be FREE for you if your order quantity for each size is more than 10,000pcs, please your own design logo CDR file to us.
7.About Quality Control:
QC Department monitors from incoming materials to every important production steps. THREE main testings will be carried out: Salt Spray Test; Torque Test; Tensile Test for loading capacity.
8.About Delivery:
Depends on the products, basically 15-35 working days after prepayment.
9.About Certifications:
ROHS, SGS,FM/UL(on Customer’s brand), we are able to acquire the certifications for your needs.
10.About Payments:
Please kindly note that our payment term is 50% prepayment before production, 50% balance payment before delivery.
Hot Searches