- Product Details
- {{item.text}}
Quick Details
-
Weight (KG):
-
0.2 kg
-
After-sales Service Provided:
-
Engineers available to service machinery overseas
-
Filter Medium:
-
Polypropylene
-
O-ring Seal:
-
Ethylene Propylene Rubber
-
Maximum Differential Pressure:
-
2.0 bar
-
Max. Operating Temperature:
-
60 °C
-
Nominal Length:
-
10 Inch
-
Filtration Efficiency:
-
99.5%
-
Color:
-
White
Quick Details
-
Core Components:
-
Filter
-
Place of Origin:
-
China
-
Brand Name:
-
TIANYU
-
Weight (KG):
-
0.2 kg
-
After-sales Service Provided:
-
Engineers available to service machinery overseas
-
Filter Medium:
-
Polypropylene
-
O-ring Seal:
-
Ethylene Propylene Rubber
-
Maximum Differential Pressure:
-
2.0 bar
-
Max. Operating Temperature:
-
60 °C
-
Nominal Length:
-
10 Inch
-
Filtration Efficiency:
-
99.5%
-
Color:
-
White
40 Inch PP String Wound Water Element
Applications :
1. Pretreatment filter of drinking water & pretreatment of RO filter;
2. Acid & alkali solution filter in chemical industry;
3.Imaging medicine & pigment filter;
4.Pretreatment filter of sterile-water and ultrapure water;
5.Water recycling system and environment protection.
Parameter specification:
Media Material |
PP fiber, cotton, fiber glass |
Working temperature |
≤ 60℃ |
Working pressure |
2.0 bar(21℃ ) |
Media structure |
Graded density |
Precision |
1μm, 3μm, 5μm,10μm, 25μm, 50μm, 75μm, 100μm |
Dirt holding capacity(Efficiency) |
99.5% |
Life span |
1-5 months |
Replacing pressure |
2.4 bar (20℃ ) |
Technical Parameters;
Dimension |
Length |
5",9.75",,9.87",10",20",30",40",50",60" |
ID |
28mm,30mm Or according to your requirement |
|
OD |
Standard 62mm,63mm,110mm Or according to your requirement |
|
Material & Structure |
Media |
PP fiber, cotton, fiber glass |
Support layer |
PP, stainless steel |
|
End cap |
PP |
|
Gasket/ring |
Ethylene-propylene rubber, nitrile rubber |
|
Type of end cap |
flat, 222/fin,222/flat,226/fin,226/flat.etc |
Packaging Details: Neutral packing.Carton inside,wooden case outside.Or custom-made according to the request.
Delivery Details: Generally,7 working days after received your payment. But if you are urgent,we can give you the best delivery time to meet your demand.