- Product Details
- {{item.text}}
Quick Details
-
Productivity:
-
180m3/h
-
Place of Origin:
-
China
-
Brand Name:
-
other
-
Weight:
-
7000 kg
-
Dimension(L*W*H):
-
12700*2540*4000mm
-
Hopper volume:
-
0.8m3
-
Theoretical delivery at low pressure:
-
9MPa
-
Conveying cylinder inner diameter*stroke:
-
230*1600mm
-
Theoretical output at high pressure:
-
50m3h
Quick Details
-
Power Type:
-
Diesel
-
Max. vertical conveying distance:
-
150M
-
Max. horizontal conveying distance:
-
600M
-
Productivity:
-
180m3/h
-
Place of Origin:
-
China
-
Brand Name:
-
other
-
Weight:
-
7000 kg
-
Dimension(L*W*H):
-
12700*2540*4000mm
-
Hopper volume:
-
0.8m3
-
Theoretical delivery at low pressure:
-
9MPa
-
Conveying cylinder inner diameter*stroke:
-
230*1600mm
-
Theoretical output at high pressure:
-
50m3h
New Diesel Stationary Hydraulic Concrete Pump Trailer HBT60 Reasonable Price On Sale
Contact way
Sales Manager
Mark Li
Newindu Construction Engineering (Shanghai) Co.,Ltd
Add: Suite 2801, Super Ocean Finance Center,2067 West Yan'an Road, Shanghai 200336, China
Tel: +86-21-62770109 Fax: +86-21-62120109
Mobile / Whatsapp/ Skype/Wechat: +86-13764758759
Web: www.newindu.com
Mark Li
Newindu Construction Engineering (Shanghai) Co.,Ltd
Add: Suite 2801, Super Ocean Finance Center,2067 West Yan'an Road, Shanghai 200336, China
Tel: +86-21-62770109 Fax: +86-21-62120109
Mobile / Whatsapp/ Skype/Wechat: +86-13764758759
Web: www.newindu.com
Products Description
(1) The towed concrete pump can be towed by motor vehicles, but shall not carry any cargo, and the towing speed shall not exceed 8km/h;
(2) The pressure of each safety valve of the hydraulic system of the concrete pump shall meet the requirements of the manual, and the user shall not adjust or change it;zmwm02
(3) Antifreeze measures should be taken for the construction of concrete transfer pumps in cold seasons;
(4) During construction in hot seasons, the concrete pump should prevent the oil temperature from being too high. When the temperature reaches 70℃, stop the operation or take other measures to cool down;
(5) After pumping concrete, clean the hopper, S valve, concrete cylinder and conveying pipeline in time. After the pump is cleaned, the pressure of the accumulator should be released, the power supply should be cut off, and the switches should be in the stop or disconnected position;
(6) Staff are not allowed to climb or ride on the pipeline, and should absolutely avoid it when working at heights;
(7) Before the pumped concrete is cleaned, it is necessary to reverse the pump for several strokes to reduce the pressure in the conveying pipe and avoid accidents;
(8) Safety and accident prevention devices shall be installed on the construction site. Such as: indicating and warning signs, fences, metal baffles, etc., set up a necessary working area (not less than 1 meter) around the pump, and non-operators are not allowed to enter without permission. Regularly replace the conveying pipeline within three meters from the operator, which must be fastened and screened with wooden boards or metal partitions;
(9) It is strictly forbidden to operate when the reading of the vacuum gauge is greater than 0.04Mpa, otherwise the main oil pump may be damaged;
(10) The use, installation and wiring of the Dieselal control box must be carried out by professionals;
Product Paramenters
Maximum Theoretical Concrete Delivery Volume
|
60m³/h
|
Maximum Pumping Concrete Pressure
|
13MPa
|
Distribution Valve Form
|
S-pipe valve
|
Concrete Conveying Cylinder Bore*Stroke
|
Φ200*1400mm
|
Outlet Diameter
|
Φ200mm
|
Rated Power
|
6108
|
Rated Speed
|
1480r/min
|
Hydraulic Circuit Form
|
open circuit
|
Pumping Xiyong Oil Pressure
|
28MPa
|
Oil Pressure Of Stirring System
|
8MPa
|
Hydraulic Tank Volume
|
560L
|
Maximum Conveying Vertical Distance
|
150m
|
Maximum Conveying Horizontal Distance
|
300m
|
Maximum Particles Allowed
|
40mm
|
Dimensions L*W/*H
|
4800*1850*1850mm
|
Total Mass
|
4500KG
|
Details Images
Recommend Products
Hot Searches