- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
RTM
-
Model Number:
-
RTM-027
-
Connector:
-
CGA600
-
Tip diameter:
-
11.5mm
-
Application:
-
HVAC
-
Standard nozzle:
-
dia 9.7mm
-
big nozzle:
-
dia 11.5mm
-
Temperature:
-
1650 ℃
-
containue working time:
-
160 mins
-
Color:
-
Green/blue/Yellow/black
Quick Details
-
Type:
-
Welding Torch
-
Warranty:
-
1 year
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
RTM
-
Model Number:
-
RTM-027
-
Connector:
-
CGA600
-
Tip diameter:
-
11.5mm
-
Application:
-
HVAC
-
Standard nozzle:
-
dia 9.7mm
-
big nozzle:
-
dia 11.5mm
-
Temperature:
-
1650 ℃
-
containue working time:
-
160 mins
-
Color:
-
Green/blue/Yellow/black
High quality propane gas hand held welding torch RTM-027
1)Product description:
1.Safe,reliable,easy to handle.
2.Hand-lighting,wide range of temperature control,rapid temperature raising,the instantaneous welding/brazing temperature can reach to 1650 degree celsius.
3.Tip swivels 360 degree
4.Using a single industrial gas MAPP gas or Propane,and the design of combustion-supporting of the oxygen of air.
5.Being portable,the G.W. of the MAPP gas is 890G,RTM-27D is 550G
6.The full burning time of a bottle of MAPP gas:about two hours.
7.Low in fuel consumption,long lasting service life.
Simple to disassemble and easy to maintain,spare parts and accessories provided.
3)Application
1.For soldering and brazing.
2.Suitable for welding copper pipes,aluminium tubes,and copper pipes with aluminium tubes in refrigeration field,high and low voltage electricity,express highway,fridge,hardware,maintenance of equipment etc.
4.Packing information
Model | Qty/Ctn(pcs) | G.W.(KGS) | N.W.(KGS) | Carton size(cm) |
RTM-2
(High class model,butterfly diaphram design) |
20 | 15.1 | 14.2 | 58X36.50X35.50 |
RTM-26D(Copper body,economical model,piston design) | 20 | 13.3 | 12.4 | 45X35x21.5 |
RTM-27D(Aluminium body,piston design) | 20 | 11 | 10.1 | 45X35X21.5 |
1. Q: Where is your company?
A: w e are located in Guangzhou, the capital city of Guangdong Province, near to Shenzhen, Foshan & Hong Kong, very convenient for shipping.
2 . Q: How about the MOQ?
A: 1 unit is ok.
3.
Shipping methods and lead time?
By Express: 5 -10 working days to your door (DHL, UPS, TNT, FedEx...).
By Air: 7-10 working days to your airport.
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference.
Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days).
4 . What is the term of Payment?
T/T, L/C , Paypal ; credit card ; alibaba trade insurance
5 . What are your main products?
Compressors;
Refrigeration gas and oil ;
Refrigeration spare parts ;
Cold room panels and equipments .
6 . Packaging & Shipping:
Packing: wooden pallet, wooden case or with outer carton, or as per customers' specific requirements.