- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
Faith
-
Dimension(L*W*H):
-
5.30*2.65*3.3m
-
Weight:
-
2T
-
Product name:
-
Industrial 0.35mw/h - 0.7mw/h Oil-fired Hot Air Oil Generator
-
Application:
-
Industrial Production
-
Capacity:
-
0.35-14mw/h
-
Fuels:
-
Coal, wood, biomass
-
Stam temperature:
-
194
-
Warranty Period:
-
1 year
-
Heat efficient:
-
85%
-
Type of boiler:
-
Vertical boiler
-
Medium:
-
Air
-
Application Field:
-
Papermaking Industry
Quick Details
-
Core Components:
-
FIRE TUBE
-
Steam Production:
-
0.35-14mw/h
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
Faith
-
Dimension(L*W*H):
-
5.30*2.65*3.3m
-
Weight:
-
2T
-
Product name:
-
Industrial 0.35mw/h - 0.7mw/h Oil-fired Hot Air Oil Generator
-
Application:
-
Industrial Production
-
Capacity:
-
0.35-14mw/h
-
Fuels:
-
Coal, wood, biomass
-
Stam temperature:
-
194
-
Warranty Period:
-
1 year
-
Heat efficient:
-
85%
-
Type of boiler:
-
Vertical boiler
-
Medium:
-
Air
-
Application Field:
-
Papermaking Industry
![](https://cdn.bestsuppliers.com/seo_products_img/faithheatenergy/18b99028bef731ae90ddd7bb1af7609e.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/faithheatenergy/b9161a6cbda13022a1e544bd2c05d5db.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/faithheatenergy/17c5c5868fe53980aab4c2ec9aac33a8.png!/rotate/180)
Provide hot air for drying, heating, melting, reacting; High heat efficiency, convenient installing, reliable using.
Description
|
Heat Output
|
Heat value
|
Air Output
|
Temperature
|
|
|
|
|
|
Unit
|
kw/h
|
kcal/h
|
m³/h
|
℃
|
LRF120
|
120
|
100,000
|
3500
|
60-200
|
LRF240
|
240
|
200,000
|
3800
|
60-200
|
LRF350
|
350
|
300,000
|
4000
|
60-200
|
LRF700
|
6700
|
600,000
|
5200
|
60-250
|
RF1400
|
1400
|
1,200,000
|
6800
|
60-250
|
FR2100
|
2100
|
1,800,000
|
10000
|
60-350
|
RF2800
|
2800
|
2,400,000
|
15000
|
60-350
|
RF4200
|
4200
|
3,600,000
|
20000
|
60-350
|
Name
|
Coal/wood fired hot air boiler
|
Pressure
|
0.7Mpa-2.5Mpa
|
Fuel
|
Coal, Biomass pellet, Rice Husk, Bagasse, etc.
|
Power
|
0.35mw/h - 14mw/h
|
![](https://cdn.bestsuppliers.com/seo_products_img/faithheatenergy/d0a13b297e2b3461a16b7b52cc9afcfa.jpg!/rotate/180)
Description:
LRF coal-fired hot air generator consists of LRF coal-fired machine, hot gas purifying chamber, and air mixing chamber. Coal-fired machine supplies the primary heat. Raw (soft) coal is fed into the coal hopper through the coal feeder. The coal at a certain height is delivered by chain grate into the burning chamber of coal-fired machine. With the help of combustion fan, hot semi-coal gas produced by burning coal erupts from fire outlet of coal-fired machine and enters in hot gas purifying chamber. The chamber is
built of fire resistant materials; hot semi-coal gas begins secondary combustion in purifying chamber.
built of fire resistant materials; hot semi-coal gas begins secondary combustion in purifying chamber.
Adopt multi - head spiral groove heat transfer technology
Heat temperature
can adjust from
200-400℃
can adjust from
200-400℃
Easy installation and operation
2tph steam boiler in UZ
4tph diesle steam boiler in Kenya
25tph steam boiler in Myanmar
Vertical coal fired steam boiler in Chile
3mkcalph coal fired thermal oil boiler in Vietnam
2tph biomass boiler in Togo
1200kw diesel fired thermal oil boiler in Zimbabwe
2tph coal steam boiler in Philippines
10tph steam boiler in Ukraine
25tph coal fired steam boiler in Bangladesh
Electrical steam boiler in Ethiopia
2x12m wood treatment equipment in Zambia
Q1: What are the payment terms?
T/T,L/C and trade assurance are acceptable,T/T will be more appreciated,30% deposit before production,70% balance before shipment.
Q2: What is the delivery time?
Around 15-30days after the deposit for most machines
Q3: How to pack the machine?
Standard packaging.
Q4: How to install after the machines arriving destination?
Q2: What is the delivery time?
Around 15-30days after the deposit for most machines
Q3: How to pack the machine?
Standard packaging.
Q4: How to install after the machines arriving destination?
Our engineer will go to customers site if you need,but need to pay installation fee according to the contract.
Q5: What's the capacity you can do?
We always produce any capacity depend on customers' requirement.
Hot Searches