Preventive measures for rupture of mantle.
1. Level and adjust the liner when installing so that the load around the liner is evenly balanced during crushing.
2. When installing the liner, the filler must be thoroughly mixed and evenly stirred to ensure higher strength after the filling solidifies.
3. When installing the liner, the filler solidification time is generally required to be about 16 hours to completely solidify the filler and ensure sufficient strength before it can be broken.
4. When installing the lining plate, the locking screws must be tightened in place and the tightening strength is sufficient to prevent the lining plate from loosening during the crushing process.
5. The upper compression torch ring when installing the liner.