- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Construction, chemical industry,mineral, ore slurry mixing
-
Installation:
-
already finished installed agitation tank
-
Effective volume:
-
10.5 m3
-
Impeller Diameters:
-
500, 750,1000,1200,1500,1800,2000, 2500, 3000 mm
-
Impeller speed:
-
49.6 r/min
-
Weight:
-
3400kg
Quick Details
-
Weight (KG):
-
350
-
Place of Origin:
-
Jiangxi, China
-
Brand Name:
-
Yongsheng
-
Application:
-
Construction, chemical industry,mineral, ore slurry mixing
-
Installation:
-
already finished installed agitation tank
-
Effective volume:
-
10.5 m3
-
Impeller Diameters:
-
500, 750,1000,1200,1500,1800,2000, 2500, 3000 mm
-
Impeller speed:
-
49.6 r/min
-
Weight:
-
3400kg
Product Description
Single impeller agitation tank is the most popular model at present. The impeller is located in the bottom of the cycle barel in order to mix the ore pulp with chemical. By experiment, our new design will replace I II model agitation tank to improve the mixing efficiency.
Specification
Model
|
Tank Diameter
(mm) |
Tank Height
(mm) |
Effective Volume
(m3) |
Impeller Diameter
(mm) |
Impeller Speed
(r/min) |
Motor Model
|
Motor Power
(kw) |
Weight
(kg) |
XB05
|
500
|
500
|
0.078
|
240
|
530
|
Y80M2-4
|
0.75
|
160
|
XB07
|
750
|
750
|
0.26
|
240
|
530
|
Y80M2-4
|
0.75
|
228
|
XB10
|
1000
|
1000
|
0.58
|
240
|
530
|
Y90S-4
|
1.1
|
350
|
XB12
|
1200
|
1200
|
1.14
|
400
|
320
|
Y112M-6
|
2.2
|
765
|
XB15
|
1500
|
1500
|
2.2
|
400
|
320
|
Y132S-6
|
3
|
1360
|
XB20
|
2000
|
2000
|
5.5
|
550
|
230
|
Y132M2-6
|
5.5
|
1800
|
XB25
|
2500
|
2500
|
11
|
625
|
230
|
Y160M-6
|
7.5
|
2270
|
XB30
|
3000
|
3000
|
19.1
|
800
|
200
|
Y225S-8
|
18.5
|
4296
|
XB35
|
3500
|
3500
|
29.5
|
850
|
190
|
Y225M-8
|
22
|
5580
|
XB40
|
4000
|
4000
|
46
|
1000
|
160
|
Y250M-8
|
30
|
8036
|
Contact Person: Climber Zeng
Tel/ WhatsApp/ WeChat Number: 0086 17770734021
Website 1: www.goldseparating.com (all languages)
Website 2: www.ysxksb.en.alibaba.com
E-mail: yongshengmachines@hotmail.com
Address: No. 3, Industrial Avenue, Guzhang Industrial Park, Shicheng County, Ganzhou City, Jiangxi Province, China. Post code:342700
Website 1: www.goldseparating.com (all languages)
Website 2: www.ysxksb.en.alibaba.com
E-mail: yongshengmachines@hotmail.com
Address: No. 3, Industrial Avenue, Guzhang Industrial Park, Shicheng County, Ganzhou City, Jiangxi Province, China. Post code:342700
FAQ
Q: What is the payment terms ?
A: 1.30% prepayment by T/T , after the seller finish the production process and buyer verify the machine , 70% balance should paid before delivery.
2. .Alibaba trade assurance L/C is also acceptable in special conditions.
Q: How long is the delivery time of your machine?
A: 1. The delivery time is within 7-30 working days.
2. But if the project is very large and clients have some special requirement about the equipment, the delivery time will be extend.
Q: How long will the shipment takes ? (roughly)
A: 1. Africa : 30-45 days
Asia : 5-25 days
America : 15-40 days
Europe : 30-40 days
Q: How long is the warranty period about machine?
A: 1. Our machine warranty period is 1 year.
2. Wearing parts and problem coursed by worker's wrong operation are not included.
Q: Can you provide me a solution and quotation?
A: Of course. Please give us your details about project, raw material, the capacity, max feeding size, the output size, the usage of final products, etc.
A: 1.30% prepayment by T/T , after the seller finish the production process and buyer verify the machine , 70% balance should paid before delivery.
2. .Alibaba trade assurance L/C is also acceptable in special conditions.
Q: How long is the delivery time of your machine?
A: 1. The delivery time is within 7-30 working days.
2. But if the project is very large and clients have some special requirement about the equipment, the delivery time will be extend.
Q: How long will the shipment takes ? (roughly)
A: 1. Africa : 30-45 days
Asia : 5-25 days
America : 15-40 days
Europe : 30-40 days
Q: How long is the warranty period about machine?
A: 1. Our machine warranty period is 1 year.
2. Wearing parts and problem coursed by worker's wrong operation are not included.
Q: Can you provide me a solution and quotation?
A: Of course. Please give us your details about project, raw material, the capacity, max feeding size, the output size, the usage of final products, etc.
Hot Searches