- Product Details
- {{item.text}}
Quick Details
-
Metal Material:
-
Zinc Alloy/Brass
-
Rubber Material:
-
Natural Rubber
-
Color:
-
Silver
-
Function:
-
inflate or deflate a tubeless tire
-
Connection Type:
-
Clamp in
-
Surface Finish:
-
Nickel Plated
-
Packing:
-
100pcs per opp bag,10bags per carton
-
Valve accessories included:
-
#9000 valve core,valve cap,groment,hexagonal nuts,washer,
-
Quality Test:
-
100% Tested
-
Warranty:
-
1 Year
Quick Details
-
OE NO.:
-
84813000
-
Brand Name:
-
Neutral/OEM
-
Place of Origin:
-
Zhejiang, China
-
Metal Material:
-
Zinc Alloy/Brass
-
Rubber Material:
-
Natural Rubber
-
Color:
-
Silver
-
Function:
-
inflate or deflate a tubeless tire
-
Connection Type:
-
Clamp in
-
Surface Finish:
-
Nickel Plated
-
Packing:
-
100pcs per opp bag,10bags per carton
-
Valve accessories included:
-
#9000 valve core,valve cap,groment,hexagonal nuts,washer,
-
Quality Test:
-
100% Tested
-
Warranty:
-
1 Year
Specifications
Item No.
|
Height(mm)
|
Base Diameter(mm)
|
Net Weight
|
Packing
|
VAMD161 Aluminum
|
33
|
14mm
|
about 9.7g
|
100pcs/opp bag,
100bags/Carton
|
VAMD161
Zinc Alloy
|
33
|
14.4mm
|
about 12.2g
|
|
VAMD161 Brass
|
33
|
14.6mm
|
about 17.8g
|
|
VAMD161-L Aluminum
|
39
|
14mm
|
about 10.3g
|
|
VAMD161-L
Zinc Alloy
|
39
|
14.4mm
|
about 13.9g
|
|
VAMD161-L Brass
|
39
|
14.6mm
|
about 16.9g
|
HENGBIN corporation
specialized in tire parts designing and manufacturing with professional engineers and experienced sales staff. Our factory production capacity of 1 billion pcs of tire valves, covering a complete range of tire valves , tire valve cap, tire repair tools,and some car&motorcycle modified parts etc.,With an advanced production line and inspection equipments, as well as a well-ran quality control system, we win a good reputation in customers at home and abroad. We are also qualified with ISO/TS16949:2012 international quality management system certification. We sincerely invite all friends to join hands for mutual development and establish a long-term business relationship.
Our most professional packaging
Transport of large trucks to the seaport
And international transport cooperation
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral opp bags and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take
15 to 45
days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply
free
sample if we have ready parts in stock, but the customers have to pay
the courier cost.
Regard to
Customized samples
,customer pay sample costs and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.