- Product Details
- {{item.text}}
Quick Details
-
Lift Speed:
-
0.18 to 0.045m/min
-
After-sales Service Provided:
-
online suppor, Online support
-
Item:
-
DHK type electric chain
-
Type:
-
DHk
-
Rated Capacity:
-
2 ton
-
Standard Lifting Height:
-
3/6/9 meters
-
Voltage:
-
380v/415v
-
Motor power:
-
500w
-
Lifting speed:
-
3m/min
-
Hook:
-
Heat Treatment
-
Color:
-
Red and black
-
After Warranty Service:
-
Video technical support, Online support, Spare parts, Field maintenance and repair service
-
Local Service Location:
-
None
-
Certification:
-
CE
Quick Details
-
Warranty:
-
1 Year
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
Ju Ying
-
Lift Speed:
-
0.18 to 0.045m/min
-
After-sales Service Provided:
-
online suppor, Online support
-
Item:
-
DHK type electric chain
-
Type:
-
DHk
-
Rated Capacity:
-
2 ton
-
Standard Lifting Height:
-
3/6/9 meters
-
Voltage:
-
380v/415v
-
Motor power:
-
500w
-
Lifting speed:
-
3m/min
-
Hook:
-
Heat Treatment
-
Color:
-
Red and black
-
After Warranty Service:
-
Video technical support, Online support, Spare parts, Field maintenance and repair service
-
Local Service Location:
-
None
-
Certification:
-
CE
1ton building used chain electric hoist,easy operation remote control chain hoist,DHK type electric chain
Type | DHP |
Capacity | 7.5 ton |
Standard lifting Height | 3 meters |
Lifting Speed | 3m per min |
Voltage | AC 380v/50Hz |
Remark |
DHk type endless-chain electric hoist keeps the features of chain hoist's light and convenient, and improves the disadvantages of chain hoist such as manual operation and the slow lifting speed. It integrates the superiority of electric and chain hoist, compact structure, light weight, high efficiency, use conveniently, simple maintenance. And It could be used together with other DHP hoist, so that the lifting net could be founded better, because of its slow lifting speed.
|
Pictures of DHK type electric chain
Workroom of DHK type electric chain
Before the packing, the electric chain hoist must be checked by our inspection systerm. And the wire rope must be made sure that it could not break When the full load was lifted. If not, that piece chain block would not be passed. |
1.CE,TUV certificate
2.Chain: G80 alloy steel
3.Hook: Deep Forged, High alloy steel 4.Gear: High standard Gear steel 5.Cover: 45# steel 6.Surface treatment: Painting 7.Longer life span |
1. Packing: Wooden case and Pallet 2. MOQ:1 piece 3. Payment: 30% TT in advance 4. Lead time: 1 day 5. Delivery time: 1 week 6. Load Port: Tianjin |
1. On line in 24 hours 2. TUV Certificate 3. OEM Product and Packing 4. Prompt Delivery 5. The necessary documents of clearing 6. Supply the reparing parts 7. The technical suggestion of install and application |