- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
In-saiL
-
Model Number:
-
QT
-
Product name:
-
Threaded Insert Nut
-
Material:
-
Brass/Carbon Steel/ SUS/Aluminum
-
Surface treatment:
-
Nature/Electroplated/ Oxide/ Passivated
-
Certificate:
-
ROHS/Reach
-
Packing:
-
PE bag+Carton
-
Process:
-
heat Staking/ Ultrasonic
Quick Details
-
Finish:
-
ZINC PLATED, passivated, Nickel Plated, Cleaning
-
Measurement system:
-
Metric, Imperial (Inch)
-
Application:
-
Heavy Industry, Mining, Water Treatment, Healthcare, Retail Industry, Food & Beverage, General Industry, Oil & Gas, Automotive Industry
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
In-saiL
-
Model Number:
-
QT
-
Product name:
-
Threaded Insert Nut
-
Material:
-
Brass/Carbon Steel/ SUS/Aluminum
-
Surface treatment:
-
Nature/Electroplated/ Oxide/ Passivated
-
Certificate:
-
ROHS/Reach
-
Packing:
-
PE bag+Carton
-
Process:
-
heat Staking/ Ultrasonic
Materials |
Brass C3604, Brass 6801, Carbon Steel 1215MS, Aluminum 2024-T4,
SUS316 |
Finish | Cleaning, Passivated, Electroplated |
Application | Heavy Industry, Mining, Water Treatment, Healthcase, Retail Industry, Food & Beverage, General Industry, Oil & Gas, Automotive Industry |
Tolerances | ISO2768-m |
Thread | Metric,Inch |
Certification | RoHS, Material Certification, PPAP |
Lead Time | 5-10 working days |
Samples | Welcome |
Management System | ISO9001 |
Delivery term | By DHL, UPS, TNT, FedEx, EMS, By Ocean, By Air |
Production Capability | Auto-lathe turning:OD0.5-20mm, Tol.0.01mm |
CNC lathe turning:OD0.5-250mm, Tol.0.005mm | |
CNC Milling:800x600mm(LxW), Tol.0.05mm | |
Grinding: Tol. 0.002mm | |
Screw heading & rolling:Metric 0.8-M6, UnifiedImperial#0-1/4'' | |
Stamping: 200Tmax |
FAQ
Q1:How to guarantee the Quality of Industrial Parts?
A1:We have been in fastener field over ten years with full experience. And there are 5 checks in the whole processing, We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts production.
Q2:Can I get a sample before mass production?
A2: We can provide free sample if we have this in stock,
as long as
you afford the
freight.if
no stock, We can produce for you after get sample fee. lead time:5-7 workdays.
Q3:
What is the lead time of the mass production?
A3
:
Normally, 7-15 workdays, it depends on the quantity.
Q4:What's the advantage?
A4: The competitive prices, fast delivery and high quality. responsible-oriented
employees
strict tolerance, smooth finish and long-life performance.