Products
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price
6 inch well casing pipe 150mm diameter mild steel pipe per length price

6 inch well casing pipe 150mm diameter mild steel pipe per length price

FOB Reference Price: Get Latest Price
≥5 Pieces
US $650
≥50 Pieces
US $580
≥100 Pieces
US $550
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Oiled or Non-oiled:
Non-oiled
Invoicing:
by actual weight
Place of Origin:
Tianjin, China
Outer Diameter:
219 - 2020 mm
Thickness:
2 - 20 mm
Grade:
Q235B
Delivery Time:
25 days, 30 days
Surface:
Hot dipped galvanized
Zinc coating:
200-500g/m2
Type:
seamless steel pipe
Pipe end:
Plain ends / Bevelled ends
company style:
Manufactory, mill, producer & exporter
Production lines:
170 Production Lines
Volume:
export 13 Million Tons
standard:
have been export to more than 100 countries

Quick Details

Section Shape:
Round
Surface Treatment:
galvanized
Tolerance:
±5%, ±1%
Oiled or Non-oiled:
Non-oiled
Invoicing:
by actual weight
Place of Origin:
Tianjin, China
Outer Diameter:
219 - 2020 mm
Thickness:
2 - 20 mm
Grade:
Q235B
Delivery Time:
25 days, 30 days
Surface:
Hot dipped galvanized
Zinc coating:
200-500g/m2
Type:
seamless steel pipe
Pipe end:
Plain ends / Bevelled ends
company style:
Manufactory, mill, producer & exporter
Production lines:
170 Production Lines
Volume:
export 13 Million Tons
standard:
have been export to more than 100 countries
Product Description
Product Name
6 inch well casing pipe 150mm diameter mild steel pipe per length price
(O.D) Outer Diameter
20MM-1219MM
(W.T)Wall thickness
0.6MM-20MM
Length
1M, 4M, 6M, 8M, 12M (accroding to the buyer's request)
Ends
Plain, Beveled, Thread With Couplings Or Sockets;
Plastic Caps And Steel Rings Can Be Provided If Possible
Standard
GB/T3091-2001 , BS 1387-1985 , DIN EN10025 , EN10219 , JIS G3444:2004 , ASTM A53 SCH40/80/STD , BS- EN10255-2004
Grade
Q195/Q215/Q235/Q345/S235JR/GR.B-D/STK500
Technique
Hot Rolled Or Cold Rolled ERW
Package
Covered With Tarpaulin, Containers Or In Bulk
Certification
CE, BV, SGS, ISO9001, API
Delivery Time
stock or Usually within 10-45 days after receipt of advance payment

Standard:

API 5L, ASTM A53, ASTM A500, ASTM A252, ASTM A106,
GB/T3091, GB/T13793, GB/T9711


Material: GR.A, GR.B GR.C / Q195, Q235, Q345 / 10#, 20#


Surface:

Galvanized

Pipe Ends:

Bevelled or plain ends.

End protection: None, or Steel protectors.


Packing:

Outer diameter 273mm and above: piece by piece.
Small sizes nested into big sizes.

Manufacturing Technique
Packing & Delivery
Our Service

Before-sale service:

Welcome to visit our factories.


After-sale service:

Quality/Quantity Claims: The Buyer is entitled to make both quality and quantity claim in writing against the Seller within 90 days after arrival at the port of destination. All claims must be supported by survey reports of recognized first class surveyors within the above mentioned stipulated time frame.

Our Company

TIANJIN YOUFA STEEL PIPE GROUP CO LTD.

Youfa Steel Pipe Group was established in 2000 producing ERW steel pipe, galvanized steel pipe, square and rectangular pipe, scaffolding pipe, steel plastic composite pipe and spiral pipe.


Who We are?

(1) China Top 500 Enterprises Industry Leading Brands
(2) 17 years experience in manufacturing and exporting steel products.
(3) 12 Consecutive Years of The First Production and Sales-- Over 1300,0000 Tons sales and production
(4) Key Project Supplier ---The Capital International Airport, Shanghai Pudong International Airport, the 2008 Olympic Games venues, the Word Expo 2010, etc.


What We own?
8000 employees.
59 ERW steel pipe production lines

36 hot dipped galvanized steel pipe production lines

24 square and rectangular steel pipe production lines

18 SSAW steel pipe production lines
16 steel-plastic complex steel pipe production lines

9 hot dip galvanized square and rectangular steel pipe production lines
3 national accredited laboratory with CNAS Certificates
1 Tianjin government accreditd business technology center

YOUFA STEEL PIPE GROUP Production Base including 9 factories:

Tangshan Zhengyuan Steel Pipe Co.,Ltd;
Tangshan Youfa Steel Pipe Manufacture Co.,Ltd;
Tianjin Youfa Steel Pipe Group Co.,Ltd .-No.1 Branch;
Tianjin Youfa Steel Pipe Group Co.,Ltd .-No.2 Branch;
Tianjin Youfa Dezhong Steel Pipe Co.,Ltd;
Tianjin Youfa Pipeline Technology Co.,Ltd;
Tianjin Shiyou Steel Pipe Manufacture Co.,Ltd;
Handan Youfa Steel Pipe Co.,Ltd;
Tianjin Youfa Ruida Traffic Facilities Co.,Ltd

Tangshan Zhengyuan Steel Pipe Co., Ltd is a subsidiary of Tianjin Youfa Steel Pipe Group Co., Ltd. It is a welded steel pipe manufacturing and processing enterprise, which was established in 2010.
Our company covers 300 square meters. We have 12 hot galvanized steel pipe production lines, 5 ERW steel pipe production lines and 6 steel-plastic compound pipe production lines. We do the hydrostatic test for all the pipes from 1/2"-8".

Exhibitions and booths:

Youfa Steel Pipe Cultural Center:

Youfa Steel Pipe Creative Park—— The scenic spot combines the steel pipe industry tourism and ecological culture, and has built more than 20 visit items, such as the real scene of modern steel pipe production process, the steel pipe art gallery, the pictures of river and mountains gallery, and the steel pipe encyclopedia gallery. The project has formed a modern industrial tourism scenic spot integrating green production, popular science education, cultural experience and interesting tours.

Youfa social responsibility:

Public welfare is also an important foundation for the development of Youfa enterprises
As of now, Youfa Group has donated over ten million yuan to various public welfare undertakings. With the rapid development of the enterprise, Youfa Group has delivered a heavy response in the development of public welfare undertakings.
Related Products

Large amount of stocks:

1. ERW Steel Pipe

Size: OD 1/2"-20"
Thickness: 1.5mm-18mm
Length:6m

2.ERW Hot-dipped Galvanized Steel Pipe

Size: OD 1/2"-20"
Thickness: 1.5mm-18mm
Length:6m
Zine Coating : 30-40μm

3. Square /Rectangular Steel Pipe
Rectangular Steel Pipe

Square size: 20*20mm-500-500mm

Rectangular size: 20*40mm-300*500mm

Thickness: 1.5mm-12mm
Length:6m/12m

4. SSAW Steel Pipe

Size: OD 8"-80"
Thickness: 5mm-35mm
Length:6m/12m

Main Products
Sizes(OD.) / Dimension
Wall Thickness
Production Lines
Producing Capacity
ERW steel pipe
1/2" -- 8"
0.5mm--10.0mm
62
1,000,000 tons per year
Hot dipped galvanized steel pipe
1/2"-8"
0.5mm--10.0mm
40
1,500,000 tons per year
Oil casing pipe
219mm-2020mm
5.0mm--28mm
9
150,000 tons per year
SSAW steel pipe
Square/rectangular steel tube
10x10--800x800mm,
0.5mm--20mm
31
800,000 tons per year
10x20--800x600mm
Hot-dip galvanized square/rectangular steel tube
10x10--200x200mm,
0.5mm--15.0mm
12
250,000 tons per year
10x20--250x150mm
Seamless steel pipe
1/2"-40"
sch10, sch40, sch80,sch160
2
100,000 tons per year
Steel-plastic complex steel pipe
1/2"--12"
1.5mm--10.0mm
25
100,000 tons per year
FAQ


1.Q:Where is your factory located? How can I visit there?
We locate in Tianjin, China, 30 minutes from Beijing by train.


2.Q:Can I get some samples?
Yes,free samples can be provided


3.Q:What do your factory do regarding quality control?
From material to produts, we inspect each process to keep good quality.
And BV/SGS inspection can be accepted.


4.Q:How about MOQ ?
10 tons


5.Q: How long does your warranty?
We can assured the quality within 90 days after receiving the cargoes.

APP
Post My RFQ
WhatsApp
+86-17326049340