1.Apply release agent, assemble the mold and fix it on the construction site.
2.Reinforce the mold with wooden strips to make it stronger and increase the service life of the mold.
3.Support the mold with wooden sticks to keep it vertical
4.Prepare sand, stone and cement according to the proportion, and mix them evenly into concrete.
5.Pouring the concrete into mold, vibrate the mold while pouring to make it evenly fill the mold
6.Leave it still for 2-3 days, waiting for the concrete to solidify and form (The waiting days can be adjusted according to the weather and temperature)
7.After it is completely dry, remove the mold