①: Align the curved part of the controller hanger with the gap of the vR glasseshanger, and insert it.
②:Punch proper holes in the wall in advance, insert plastic expansion bolts intothe holes, align the reserved holes in the rack with the openings in the wall, andlock the screws in.
③:align the reserved holes in the rack with the openings in the wall, andlock the screws in.
VR glasses pendant x 1
Handle pendant x2
Plastic expansion boltx2
Screwx2
Package size:181*137*81mm
Carton size:57*46*57cm
Quantity:60PCs/box
Carton weight:13.3kg