- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
CKAG01
-
Brand Name:
-
JUNLV
-
Product name:
-
Window &Door Aluminium profile
-
Color:
-
White/Beige
-
Usage:
-
window door
-
MOQ:
-
1 Ton
-
Material:
-
6000 series Aluminum alloy,like 6063,6061
-
Finish:
-
Mill, sand blast,Anodizing,powder coating,polishing,electrophoresis
-
Deep Processing Ability:
-
CNC,Drilling,Bending,Welding,Precise cutting,etc.
-
Payment term:
-
L/C T/T(30% Deposit)
-
Delivery time:
-
20-30 Working Days
-
FOB port:
-
Guangzhou/Shenzhen/Foshan
Quick Details
-
Grade:
-
6000 Series
-
Tolerance:
-
±3%
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
CKAG01
-
Brand Name:
-
JUNLV
-
Product name:
-
Window &Door Aluminium profile
-
Color:
-
White/Beige
-
Usage:
-
window door
-
MOQ:
-
1 Ton
-
Material:
-
6000 series Aluminum alloy,like 6063,6061
-
Finish:
-
Mill, sand blast,Anodizing,powder coating,polishing,electrophoresis
-
Deep Processing Ability:
-
CNC,Drilling,Bending,Welding,Precise cutting,etc.
-
Payment term:
-
L/C T/T(30% Deposit)
-
Delivery time:
-
20-30 Working Days
-
FOB port:
-
Guangzhou/Shenzhen/Foshan
Product Description
Specification
Name
|
Window &Door Aluminium profile
|
Material
|
6000 series Aluminum alloy,like 6063,6061
|
Temper
|
T4,T5,T6
|
Specification
|
General profiles thickness from 0.7 to 5.0mm, Normal length=5.8m for 20FT container ,5.95m,5.97m for 40HQ container or customer's requirement.
|
Surface treatment
|
Mill finish, sand blast,Anodizing,powder coating,polishing,electrophoresis,wood grain
|
Shape
|
Square,round,Rectangular,etc.
|
Deep Processing Ability
|
CNC,Drilling,Bending,Welding,Precise cutting,etc.
|
Application
|
Windows&doors,kitchen,curtain wall,glass wall,LED strip,and so on.
|
Package
|
1. Pearl cotton foam for each aluminum profile;
|
|
2. Wrap with shrink film exterior;
|
|
3. PE shrink film;
|
|
4. Packed according to customer reques.
|
FOB port
|
Guangzhou/Shenzhen/Foshan
|
Payment terms
|
T/T 30% for deposit, balance before shipping or L/C at sight.
|
Delivery time
|
Sample testing: 12-15days. Mass production: 20-30days
|
Hot Searches