Products
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system
temperature control brass mixing valve Mix-water for manifold floor heating system

temperature control brass mixing valve Mix-water for manifold floor heating system

FOB Reference Price: Get Latest Price
≥1 Sets
US $149.5
≥10 Sets
US $145
≥50 Sets
US $135
≥500 Sets
US $86.8
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Surface:
Nickel plated
maximum working pressure:
10bar
Pump install center distance:
130mm
heat source connection interface::
G11/2
Temperature regulation range:
35° C-65 ° C
Starting temperature of water pump::
0 ° C-90 ° C
Warranty:
1 Year

Quick Details

Place of Origin:
China
Product name:
Water Mixing Valve Unit
Material:
Brass
Surface:
Nickel plated
maximum working pressure:
10bar
Pump install center distance:
130mm
heat source connection interface::
G11/2
Temperature regulation range:
35° C-65 ° C
Starting temperature of water pump::
0 ° C-90 ° C
Warranty:
1 Year
Product Name
Mixed Water Control Center
Model
EC-B3106
Material
Brass Hpb57-3
Surface
Nickel Plated
Pressure
Max 16bar
Temperature
-10℃-100℃
Temperature Control Range
30℃-70℃
Applicable Medium
Cold and Hot Water
Pump Connection Thread
G1-1/2"
Thread Standard
ISO228
Specification
1"

OUR SERVES

Pre-sale service
1.We have full stock and can deliver within short time.

2.OEM and ODM order are accepted, Any kind of logo printing or design are available.
3.Good Quality + Factory Price + Quick Response + Reliable Service, is what we are
trying best to offer you.
4.All of our products are produced by our professional workman and we have our
high-work-effect foreign tradeteam to serve your anytime .

Totally believe our service
After your choose
1. We will count cheapest shipping cost and make invoice to you at once.
2. Check quality again, then send out to you at 1-2 working day after your payment for the sample
3. Email you the tracking no., and help to chase the parcels until it arrive you.

After-sale service
1.We are very glad that customers give us some suggestion for price and products.
2.If you have any question,please contact us freely by E-mail or Telephone.

FAQ
1.Q: what about your MOQ?
Answer: 100 sets

2. Q: what about your delivery time for MOQ?
Answer: within 30 days after confirmed order.

3. Q: Which port will be loading?
Answer: Ningbo, Shanghai.

4. Q: How long make the sample?
Answer: about 1-2days for our existing sample, if make your own logo, it will takes 10-15days.

5. Q: Can you make our own LOGO on products?
Answer: yes, we support OEM service.

6. Q: what about your Payment item?
Answer: T/T. 30% as deposit by T/T and the balance 70% paid on receipt copy of B/L

7. Q: what trading term will be accepted?
Answer: FOB L/C

8.Q: What's your price?
A:You can contact us to get latest price .Please feel free to call or e-mail us.( Send your Inquiry Details in the Below,
Click"Send" Now!)

9. Q: How does your factory do regarding quality control?
Answer: "Quality is priority. We always attach great importance of quality to controlling from the very beginning to the very end.
Taizhou Eric Trade Co.,LTD
Add: Lupu Industrial Zone,Yuhuan city,Zhejiang China.
APP
Post My RFQ
WhatsApp
+86-17326049340