- Product Details
- {{item.text}}
Quick Details
-
Weight (KG):
-
1000
-
Product name:
-
Spray Paint Line
-
Usage:
-
Material Parts
-
Package:
-
Wooden Box
-
Keywords:
-
Powder Production Line
-
Powder recovery rate:
-
98%
-
Powder recovery time:
-
10-15 mins
-
After-sales Service Provided:
-
Online support
-
After Warranty Service:
-
Video technical support
-
Material of powder coating room:
-
PP or PVC
-
Reciprocator/Robot:
-
Design matching
Quick Details
-
Machine Type:
-
painting line
-
Warranty of core components:
-
3 Year
-
Place of Origin:
-
Henan, China
-
Weight (KG):
-
1000
-
Product name:
-
Spray Paint Line
-
Usage:
-
Material Parts
-
Package:
-
Wooden Box
-
Keywords:
-
Powder Production Line
-
Powder recovery rate:
-
98%
-
Powder recovery time:
-
10-15 mins
-
After-sales Service Provided:
-
Online support
-
After Warranty Service:
-
Video technical support
-
Material of powder coating room:
-
PP or PVC
-
Reciprocator/Robot:
-
Design matching
Product details
New Electrostatic Spray Powder Coating Equipment
Our mainly products include: Manual powder coating line, Automatic powder coating line, Power and free powder coating line, Liquid painting line, Powder dip coating line, Spray painting equipment, Dip tank pretreatment, Spray pretreatment, Sand blasting machine, Shot blasting machine, Drying Oven, Curing oven, Powder Spraying Gun, Reciprocator, Fast Color Change Powder coating booth, Filter recovery Powder Coating Booth, Powder Recovery Equipment, Overhead Conveyor Chains, etc.
All the systems are widely used on the applications of automotive, home and office appliance, machines industry, metal fabrications and so on. And through to CE, ISO 9001 standards.
Below are the process of the powder coating production line.
Process Item
|
Classify
|
Factor
|
Pre-treatment
|
Spraying type, Submarine type, Dip tank Type, Shot/Sand blasting
|
Save manpower, improve the powder coating performance
|
Drying after spraying
|
10 minutes in drying oven
|
|
Powder coating
|
Cyclone powder coating booth/Filter recovery powder coating booth/Manual powder coating machine
|
Fast color change(15min), high powder recovery rate(99.2%), no dust spill out, easy to clean, good spraying effect.
|
Curing
|
Bridge type curing oven, Tunnel type curing oven, Box type oven.
|
Temperature difference less than 3 degree, save energy, lower operating cost, high safety.
|
Conveyor system
|
Manual conveyor, Automatic conveyor, Power and free conveyor.
|
Easy to assemble, flexible, lower maintenance.
|
Various spraying systems
High-end spray gun
Hot selling country
Company presentation
Our factory
We are located in a clean and advanced science and technology production park, mainly do laser cutting machine, laser printing machine, laser welding machine, spraying production line, and supporting spray gun, welding wire, plastic powder and so on
Our team
We have a professional R & D team and after-sales personnel, but also can provide exclusive to your product customization needs and perfect design, supporting installation and after-sales service
FAQ
1. Are you a manufacturer or distributor?
We are a professional surface treatment equipment manufacturer with more than 10 years of experience, we have experienced technical team, manufacturing team, quality control team, sales team and so on.
2. How long is the warranty period?
We offer a 2-year warranty, (excluding wearing parts)
3. May I visit your factory?
Sure am. Please feel free to contact us. We'll make arrangements in advance.
4. Do you have engineers to teach me/my workers?
Yes, we offer free training to every customer. We promise to help you until everything goes well.
5. How do I pay?
You can place your order directly with Alibaba
Or contact our sales and pay to our company account via T/T bank, we also accept paypal and Western Union.
6. When is the delivery time?
For powder coated parts or powder coating machines, it is generally 1-3 working days.
For standard powder coating booths and ovens, it usually takes 7-15 working days
For custom powder coating systems or production lines, it is usually 20-40 working days
Hot Searches