Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
- Product Details
- {{item.text}}
Quick Details
-
Cream Time:
-
10-35 s (25℃)
-
Tack free time:
-
60-360 s (25℃)
-
Polyol HS code:
-
3907209000
-
Isocyanate HS code:
-
3909301000
-
Free rise density:
-
23-38 kg/m3
-
Gel Time:
-
50-230 s (25℃)
Quick Details
-
Place of Origin:
-
China
-
Brand Name:
-
BOBO
-
Product name:
-
Polyurethane
-
Cream Time:
-
10-35 s (25℃)
-
Tack free time:
-
60-360 s (25℃)
-
Polyol HS code:
-
3907209000
-
Isocyanate HS code:
-
3909301000
-
Free rise density:
-
23-38 kg/m3
-
Gel Time:
-
50-230 s (25℃)
Product Description
Raw Materials Polyurethane (Poly And Iso)
Polyol is a fully formulated polyol blend developed for spray application of PU rigid foam. The component ratio has been
adjusted to make it suitable for use with polyurethane foam spraying machines with a fixed volumetric component ratio of 1-1.2:1. It already contains sufficient quantity of blowing agent HCFC 141b to achieve the foreseen foam density.
When polyol and isocyanate (MDI) are mixed together using suitable foam spray equipment, the resulting foam has a homogeneous density. Foams which are allowed to cure for a sufficient time between the layers applied have good skin formation and show good adhesion to the sprayed surface. Special care must be taken the sprayed surfaces are not cold or wet. It is mainly used for the insulation of wall & roof & cold room & container.
![](https://cdn.bestsuppliers.com/seo_products_img/bobomachine/1600276098394/fb1b208bb00c3d3aa8573d9a9c7d40a7.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/bobomachine/1600276098394/dda2e5f558c53186822fcdf438108bfe.jpg!/rotate/180)
Specification
![](https://cdn.bestsuppliers.com/seo_products_img/bobomachine/1600276098394/18a14690158b342ba500a905902f6faf.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/bobomachine/1600276098394/ccf5608c16f13535bd3c4b5db9e646f4.jpg!/rotate/180)
|
|
Packing and Shipping
Packaging:
polyol
|
220 kg per iron drum
|
isocyanate
|
250 kg per iron drum
|
one set
|
470 kg=220kg A+250kg B
|
One 20' container
|
40 sets/80 drums/18.8 tons
|
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like to have seamless cooperation with your forwarder at your convenience.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like to have seamless cooperation with your forwarder at your convenience.
Trade Assurance
FAQ
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.
Hot Searches