- Product Details
- {{item.text}}
Quick Details
-
Type:
-
Z-20
-
Application:
-
tunnel electric coal mucker
-
Load capacity:
-
40CBM/H
-
Bucket capacity:
-
0.2CBM
-
Motor power:
-
2*10.5kw
-
Certification:
-
CE ISO
-
Weight:
-
3400kg
-
spare parts:
-
support
-
sample order:
-
support
-
Factory visit:
-
support
Quick Details
-
Weight (KG):
-
2700
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
zhong mei
-
Type:
-
Z-20
-
Application:
-
tunnel electric coal mucker
-
Load capacity:
-
40CBM/H
-
Bucket capacity:
-
0.2CBM
-
Motor power:
-
2*10.5kw
-
Certification:
-
CE ISO
-
Weight:
-
3400kg
-
spare parts:
-
support
-
sample order:
-
support
-
Factory visit:
-
support
Product Introduction
![](https://cdn.bestsuppliers.com/seo_products_img/chinacoalgroup/08c3dd666a21324bbb4d9ac2d73794ca.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/chinacoalgroup/f9966b20c57b30e492bfb67537295527.jpg!/rotate/180)
Product Introduction Of
Underground Tunnel Rocker Shovel Loader Mucking Machine Wheeled For Mine
Maintenance:
1. Remove the dirt and oil on the surface of the crawler-type excavator loader. The track part should be flushed in time.
2, check whether the fasteners of the fuselage are loose, tighten the loose parts
3. Check if the hydraulic oil is sufficient, if there is any leakage, find out the cause and add it in time. Note: When checking the leakage of the hydraulic line, wait until the working device is lowered to the ground, turn off the motor, and release the pressure in the system before the hydraulic line can be repaired.
4. Check the electrical control box and electrical circuit for abnormalities and damage.
5. Check if the swing device is flexible
6. Check whether the hydraulic cylinders are freely retractable, whether the cylinders have scratches, and whether the oil pipes and joints are leaking. If so, promptly identify the cause and eliminate it.
zmwm19
Product Paramenters
![](https://cdn.bestsuppliers.com/seo_products_img/chinacoalgroup/1361a3dda55233c49dc9cfdc7e675a1a.jpg!/rotate/180)
Product Paramenters Of
Underground Tunnel Rocker Shovel Loader Mucking Machine Wheeled For Mine
Model
|
ZQ-26
|
Bucket volume
|
0.26M3
|
Technique productivity
|
52-60M3/h
|
Loading width
|
2500-2700mm
|
Unload height
|
1250mm
|
Unload distance
|
480mm
|
Max. Air consumption
|
11.5-19M3/min
|
Working pressure
|
5-6bar
|
Gauge
|
600mm
|
Wheel diameter
|
1000mm
|
Length
|
2375
|
Width
|
1370
|
Height
|
1375
|
Motor
|
9+15kw
|
Working speed
|
about 0.79m/s
|
Promoting speed
|
0.46-0.71m/s
|
Weight
|
2700kg
|
![](https://cdn.bestsuppliers.com/seo_products_img/chinacoalgroup/9e5f9b4afc6236b0a526b631f2e39880.jpg!/rotate/180)
Products Description
Photos Description of
Underground Tunnel Rocker Shovel Loader Mucking Machine Wheeled For Mine
Why Choose Us
![](https://cdn.bestsuppliers.com/seo_products_img/chinacoalgroup/9e5f9b4afc6236b0a526b631f2e39880.jpg!/rotate/180)
FAQ
1. You are a manufacturing factory or trading company?
China Coal Group is a manufacturing factory base of mines support equipment, transport equipment, lifting equipment, spray equipment, drilling equipment, ventilation equipment and other products.
2. Where is your factory located?
Currently we have one factories in China. One located in Jining, Shandong Province, China . You are warmly welcome to visit us at any time.
3. What are your main products?
We mainly produce mining machinery and railway equipment. We can provide you with any machinery you need!
4. How long is the production leadtime?
Generally it is 15-20 days for goods in stock. In the case of out of stock or large orders, it will take 20-30 days. QTY of the orders will be taken into consideration.
5. What payment terms do you accept?
Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment), bank transfer, Paypal, L/C etc.
6. How do your quality control systems operate?
We have professional designer team, and employ experienced engineers to strictly guarantee the production. Meanwhile our factory owns ISO9001 and is CE and SGS certified.
Hot Searches