Surface Treatment technology:
Electrogalvanizing, hot dip galvanizing, coating plastic, spraying plastic
Raw material:
low-carbon Steel wire
Processing classification:
The reason for surface treatment is to strengthen the anti-corrosion strength and extend the service
life
Type of finished product:
single strand,double strand,three strand
Explore More Products
- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
LY-01
-
Coil Diameter:
-
1.5mm--3.2mm
-
Product name:
-
Barbed wire
-
Raw Materical:
-
Galvanized Iron Wire
-
Usage:
-
Anti-theft, protection
-
Keywords:
-
barbed wire
-
Use:
-
Anti-theft, protection
-
Woven:
-
Single strand,double strand,three strand
-
Application:
-
Railway
-
Surface:
-
Galvainzed
Quick Details
-
Material:
-
Iron Wire
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
LuYi
-
Model Number:
-
LY-01
-
Coil Diameter:
-
1.5mm--3.2mm
-
Product name:
-
Barbed wire
-
Raw Materical:
-
Galvanized Iron Wire
-
Usage:
-
Anti-theft, protection
-
Keywords:
-
barbed wire
-
Use:
-
Anti-theft, protection
-
Woven:
-
Single strand,double strand,three strand
-
Application:
-
Railway
-
Surface:
-
Galvainzed
Product Overview
High security Galvanized fencing Barbed Wire price Barbed wire mesh Fence steel wire price per meter
Product Specification
Details Images
single strand
double stand
three strand
Similar Products
Factory&Warehouse
FAQ
Q1:Why can you trust Anping County Luyi silk screen company?
A1:Our company has advanced production equipment, strong production strength, experienced professional production and technical personnel, strict quality management personnel, with design, manufacturing, installation supporting and future service of the complete system. The company has strong technical force, perfect production and testing equipment, products are made according to industry standards, relying on scientific and technological progress and strict management, strict quality control, and won a good reputation from customers.
Q2:How long is the delivery time?
A2:We can ship from stock the next day,If it needs to be customized, it should be in about a week.
Hot Searches