- Product Details
- {{item.text}}
Quick Details
-
Cooling Capacity:
-
50ton
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
canglong
-
Voltage:
-
380V/50HZ/3
-
Power:
-
30000
-
Dimension(L*W*H):
-
customized
-
Weight:
-
1200 KG
-
Product name:
-
walk in cooler freezer cold room
-
Application:
-
cold room
-
Keyword:
-
walk in cooler freezer
-
Material:
-
Polyurethane Insulation Board
-
Color:
-
Required
-
Certificate:
-
ISO,CE
-
Cooling type:
-
air cooled/ water cooled
-
Doors:
-
swing door/ sliding door
-
Certification:
-
CE
Quick Details
-
Temperature:
-
-5~10degree
-
Compressor brand:
-
Bristol, Bitzer, Sanyo
-
Panel Thickness:
-
100mm, 200mm, 120mm, 50mm, 150mm
-
Cooling Capacity:
-
50ton
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
canglong
-
Voltage:
-
380V/50HZ/3
-
Power:
-
30000
-
Dimension(L*W*H):
-
customized
-
Weight:
-
1200 KG
-
Product name:
-
walk in cooler freezer cold room
-
Application:
-
cold room
-
Keyword:
-
walk in cooler freezer
-
Material:
-
Polyurethane Insulation Board
-
Color:
-
Required
-
Certificate:
-
ISO,CE
-
Cooling type:
-
air cooled/ water cooled
-
Doors:
-
swing door/ sliding door
-
Certification:
-
CE
FAQ
Pls tell us the following specifications before inquiry, then we can give you the exact rates.
1. L*W*H.
2. What kind of products are storaged.
3. Setting temperature.
4. Using what kinds of refrigerant gas.
Product name | Colour Steel Sandwich Panels |
Application | Insulation of exterior wall, roof and curtain wall insulation |
Surface material | Colour Steel |
Core material | eps/pu/rock wool |
Thickness | 50mm 75mm 100mm 150mm 200mm |
Customer evaluation |
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.