- Product Details
- {{item.text}}
Quick Details
-
Area:
-
on your requests
-
Color:
-
white/beige/grey etc.
-
Application:
-
Hotel Resort etc.
-
Feature:
-
Waterproof/Fireproof/ Heat Resistant/ UV Resistance
-
Cover Material:
-
PVDF/PTFE Building Membrane
-
Frame Material:
-
GB Q235 Steel/galvanized Steel
-
Certificate:
-
CE/TUV
-
Temperature Resistance:
-
-30℃ - +70℃
-
Wind Resistance:
-
120km/h
-
Snow load:
-
100kg/sqm
-
Life Span:
-
15-30 Years
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
Timi
-
Model Number:
-
Hotel Tent
-
Area:
-
on your requests
-
Color:
-
white/beige/grey etc.
-
Application:
-
Hotel Resort etc.
-
Feature:
-
Waterproof/Fireproof/ Heat Resistant/ UV Resistance
-
Cover Material:
-
PVDF/PTFE Building Membrane
-
Frame Material:
-
GB Q235 Steel/galvanized Steel
-
Certificate:
-
CE/TUV
-
Temperature Resistance:
-
-30℃ - +70℃
-
Wind Resistance:
-
120km/h
-
Snow load:
-
100kg/sqm
-
Life Span:
-
15-30 Years
1.easy and fast to assemble and dismantle.
2.100% utilized space.
3.can be used for glamping,camping,hotel,event,greenhouse etc.
4.Waterproof/Fireproof/ Heat Resistant/ UV Resistance
Product Name
|
Hotel Tent
|
Size
|
On Your Request
|
Color
|
white/red/grey etc.
|
Application
|
Hotel/Resort etc.
|
Cover Material
|
PVDF Building Membrane
|
Frame Material
|
GB Q235 Steel
|
Connector
|
Strong hot-dip galvanized steel
|
Wind load
|
Max. 120km/h (can be reinforced)
|
Snow load
|
100kg/sqm
|
Temperature Resistance
|
-30℃ - +70℃
|
Tear Strength
|
520-580N(DIN53363)
|
Tensile Strength
|
5000-5500N(DIN53354)
|
Advantage of Membrane Structure Hotel Tent
1.variety of styles
2.semi-permanent hotel building
3.easy and quick installation
4.short construction period
5.fire resistance
6.Earthquake resistance
7.No beams and brackets
Why use membrane structure material
PVDF membrane structure material
used in membrane structure construction is a kind of film material with good strength and flexibility. It is made of fiber woven into fabric substrate and processed with resin as coating material on both sides of the substrate.The fixed material, the central fabric substrate is divided into polyester fiber and glass fiber, and the resin used as the coating material is polyvinyl chloride resin (PVC), silicone and polytetra fluoroethylene resin (PTFE). In terms of mechanics, the fabric substrate and the coating material respectively have the following functional properties.
Fabric substrate
- tensile strength, tear strength, heat resistance, durability, fire resistance.
Coating material
- weather resistance, antifouling, processability, water resistance, resistance to products, light transmission.
Excellent quality technical innovation and customer satisfaction are always pursued as we look forward to building long term cooperation with clients from all over the world.Sincerely welcome the new and old clients to cooperate with us !
1)Customization service.
We are professional OEM /ODM. We can surely help you design as long as you tell us your specific requirements.
2)Excellent quality control.
All products will be tested and trial installed before shipping by our skilled engineers.
3)Efficient cooperation.
Your inquiry will be replied within 12 hours.Our prompt responsible and helpful reply will ensure your happy purchasing.
4)Great after service.
Warranty 2 years, If the structure is damaged by quality, we will replace the new accessories or send engineers to repair it.
Q1:Is your product strong and stable enough? How about the wind loading?
Yes, steel structure and cover wind resistance and load bearing is calculated by professional software and experienced engineer team , will be more than we planned 50%.The wind load at least more than 120km/h.
Q2:What's the material of the cover,can it last long time?
The cover material is PVDF or PTFE.PVDF can last more than 15-20 years.PTFE can last more than 30 years.It have fabric inside,so it very strong,not easy to be torn.
Q3:What is the total price include freight?
The total price is based on the design of the product and the requirements of the customer, all subject to the final calculation.
Q4:When will you ship the orders?
Once the design of product is confirmed, we will arrange production plan, and inform you of the leadtime, generally it takes about 20-30 working days.