- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Hotel
-
Design Style:
-
Traditional
-
Type:
-
colum/foundation formwork, 63.5 # Formwork panel
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
GETO
-
Model Number:
-
GETO formwork
-
Material:
-
6061-T6 Aluminum Alloy
-
Product name:
-
concrete slab formwork
-
Color:
-
orginal color
-
Certificate:
-
international standard
-
Advantage:
-
Long Lifespan and green
-
Name:
-
Aluminium Formwork panels
-
usage:
-
construction concrete box culvert traveler formwork
-
Surface treatment:
-
as per your requires
Quick Details
-
Warranty:
-
3 years
-
After-sale Service:
-
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement
-
Project Solution Capability:
-
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
-
Application:
-
Hotel
-
Design Style:
-
Traditional
-
Type:
-
colum/foundation formwork, 63.5 # Formwork panel
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
GETO
-
Model Number:
-
GETO formwork
-
Material:
-
6061-T6 Aluminum Alloy
-
Product name:
-
concrete slab formwork
-
Color:
-
orginal color
-
Certificate:
-
international standard
-
Advantage:
-
Long Lifespan and green
-
Name:
-
Aluminium Formwork panels
-
usage:
-
construction concrete box culvert traveler formwork
-
Surface treatment:
-
as per your requires
If you ask me, what's the Most important thing in the world?
Developer and main contractor will tell you the Truth.
With the rapid development of economy, Time and Energy becomes particular important.
However, GETO Aluminium Formwork System save time and energy for you.
After that, you have more valuable time and energy to accompany with your family and friends.
Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.
Aluminium Formwork Benefits
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation |
After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance |
Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as: 1) Shifting of reinforcing steel rebar into assembly point 2) Removing debris from site 3) Loading and Unloading materials from trucks into site storage area. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load . Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |