- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
canglong
-
Model Number:
-
steel structure
-
Product name:
-
Galvanized steel frame structure warehouse building metal factory shed
-
Pillar & Beams:
-
H type stee
-
Purlin:
-
C type steel
-
Surface Treatment:
-
Painted & Hot dip galvanized
-
Certificate:
-
ISO9001:2008/CE
-
Wall&Roof panel:
-
EPS/PU or rock wool sandwich panel
-
Door:
-
Rolling door or sliding door
-
Window:
-
PVC or aluminium window
-
Drawing design:
-
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Quick Details
-
Grade:
-
Q235/Q355
-
Tolerance:
-
±1%
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
canglong
-
Model Number:
-
steel structure
-
Product name:
-
Galvanized steel frame structure warehouse building metal factory shed
-
Pillar & Beams:
-
H type stee
-
Purlin:
-
C type steel
-
Surface Treatment:
-
Painted & Hot dip galvanized
-
Certificate:
-
ISO9001:2008/CE
-
Wall&Roof panel:
-
EPS/PU or rock wool sandwich panel
-
Door:
-
Rolling door or sliding door
-
Window:
-
PVC or aluminium window
-
Drawing design:
-
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Canglong New design steel structure warehouse storage shed workshop metal Construction Building
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.