- Product Details
- {{item.text}}
Quick Details
-
Material:
-
USBC standard material
-
Size:
-
D26*W3.8*H2.8 M
-
Power:
-
2000W
-
Warranty:
-
1 Year
-
Quality:
-
High Standard
-
Usage:
-
Indoor Bowling Game Play
-
Install and Training Service:
-
Support
-
Game time:
-
4-10 min once time
-
Voltage:
-
110V/220V
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
Huatai Baishun
-
Product Name:
-
Bowling Equipment
-
Material:
-
USBC standard material
-
Size:
-
D26*W3.8*H2.8 M
-
Power:
-
2000W
-
Warranty:
-
1 Year
-
Quality:
-
High Standard
-
Usage:
-
Indoor Bowling Game Play
-
Install and Training Service:
-
Support
-
Game time:
-
4-10 min once time
-
Voltage:
-
110V/220V
Description
1. Equipped with fairway, ball and ball bottle according to the American Bowling Association USBC standard, and the quality is guaranteed
Ball receiver (automatic ball)
2. The ssing wooden frame structure, no ground decoration operation, wider construction conditions.3. The wooden frame adopts the l-ist standard of the United States and Australia, and has thick materials.
4. It is both wet, moisture-proof and moth-proof, and still maintains the overall stability of its level under various climate conditions.5. The carrying capacity is higher, the structure is strong and not stretched, and the ball has more texture.
6. According to the customer's choice of mute, add shock-proof glue and fill the fireproof sound-absorbing materials in the gap of the fairway base
Packing Parameter
Packing size : | ----- |
Total volume in : | ----- |
TOTAL weight : | ----- |
Packaging : | Wooden frame |
Q1. How about malfunction?
A: Our technician will make a professional solution with picture or video for customer, which shows how to operate step by step. If the spare part breaks we will replace it for customer with kind of charge or without charge.
Q2. How about the after-sales service of your products?
A: Dear don't worry about our quality and after-sales service. The machines we sold are rarely maintained and back. All of our prop gun have a permanent maintenance service. Because they are all moulded and mass-produced by our own R&D department. Core materials such as cylinders and valves are imported from Japan.
Q3. What about the lead time?
A: Mass order delivery time about 15-30 days, base on your quantity.
Q4. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling through the production process.
We are surely confident that our price is more competitive than others on top of the same quality.
Q5. What is the terms of delivery?
A: We accept FOB, EXW. You can choose one of the most convenient and cost effective way.
Q5: Is it difficult to install the machine?
A: It is easy to install. We basically complete the installation before the product is packaged, and only need to partially assemble. We will provide detailed installation instructions, so don't have to worry about assemble.