- Product Details
- {{item.text}}
Quick Details
-
Tube Length(ft):
-
4, 8
-
Input Voltage(V):
-
AC100-277V
-
CRI (Ra>):
-
80
-
Working Temperature(℃):
-
-20 - 60
-
Working Lifetime(Hour):
-
50000
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
TKLED
-
Item Type:
-
Tube Lights
-
Color:
-
warm white,pure white,cool white
-
Dimension(mm)::
-
26*2400(300/600/1500/2400)
-
LED Qty::
-
100/120/140/160/180
-
Cover::
-
Transparent/milky
-
Material::
-
Aluminium+PC
-
Bracket::
-
FA8
-
led::
-
2835
-
Certification:
-
UL/UL/PSE/RoHS
Quick Details
-
Warranty(Years):
-
5
-
Lamp Luminous Efficiency(lm/w):
-
125
-
Lamp Body Material:
-
Aluminum
-
Tube Length(ft):
-
4, 8
-
Input Voltage(V):
-
AC100-277V
-
CRI (Ra>):
-
80
-
Working Temperature(℃):
-
-20 - 60
-
Working Lifetime(Hour):
-
50000
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
TKLED
-
Item Type:
-
Tube Lights
-
Color:
-
warm white,pure white,cool white
-
Dimension(mm)::
-
26*2400(300/600/1500/2400)
-
LED Qty::
-
100/120/140/160/180
-
Cover::
-
Transparent/milky
-
Material::
-
Aluminium+PC
-
Bracket::
-
FA8
-
led::
-
2835
-
Certification:
-
UL/UL/PSE/RoHS
specification :
100-277VAC/100-240VAC
CE ROHS TUV SAA UL PSE Certified
PF>0.9 10 0LM/W-150LM/W
3-5 years warranty
Competitive Advantages
Super cost-effective price with good quality
Factory directly offer
Experienced R&D team
Modernized machine to produce low down the cost
FA8 PIN 36/48W T8 LED Light Tube 8 FT 2400MM
CE ROHS TUV SAA PSE T5 INTEGRATED LED TUBE LIGHT
CE ROHS TUV SAA PSE T5 LED TUBE LIGHT
CE ROHS TUV SAA PSE T8 INTEGRATED LED Tube Light
CE ROHS TUV SAA PSE LED TUBE LIGHT
Lamp body Material:PC /Alu PC/GLASS various choice
CE ROHS Certificate
UL ETL CERTIFICATE
ISO9001:2008 CERTIFICATE
Applicat ions:
1.Residential lighting
2.Commercial lighting
3.Advertisment lighting
4.Light box
5.City Beautification
Application: Household, restaurant, hotel, garage, store, mall, office and show room lighting and many others.
Trade Terms:
1. Payment: T/T only 30% deposits before production, 70%balance to be paid before delivery.
2. Production Lead Time for 100~500pcs: 5~7days
3. Sample can be delivered in 5days.
4.Shipping freight are quoted under your requests.
5.Shipping port: Shenzhen, Mainland China.
6.Discounts are offered based on order quantities.
Shipping:
1. FOB: Shenzhen, Mainland China
2. By DHL or Fedex express;
3. By sea to the main coastal city in your country;
4. By airmail or EMS;
5. Any other available methods for delivery accepted by both parties.
Auto-asse m bly machine to assemble tube.