- Product Details
- {{item.text}}
Quick Details
-
Material:
-
Steel
-
Color:
-
Black
-
Warranty:
-
12 Months
-
MOQ:
-
2 PCS
-
Usage:
-
EV Extended Range
-
Package:
-
Carton Package
Quick Details
-
Place of Origin:
-
China
-
Product name:
-
EV Charger Cable Management
-
Application:
-
Charger Cable Managment
-
Material:
-
Steel
-
Color:
-
Black
-
Warranty:
-
12 Months
-
MOQ:
-
2 PCS
-
Usage:
-
EV Extended Range
-
Package:
-
Carton Package
We are a factory,professional factory!!!
Price & Quality are our Core Competitiveness.
Provide OEM & ODM Service, Contact us!
|
Product Description
Specification
item
|
value
|
Place of Origin
|
China
|
Product name
|
EV Charger Cable Management
|
Application
|
Charger Cable Managment
|
Material
|
Steel
|
Color
|
Black
|
Warranty
|
12 Months
|
MOQ
|
2 PCS
|
Usage
|
EV Extended Range
|
Package
|
Carton Package
|
FAQ
Q1: Which countries do you often export?
A1: Our products have been exported to >20 countries (Norway, Italy, UK, Germany,Korea, Sweden, Poland, Australia, Romania,Thailand etc.). Global player with Chinese speed.
Q2: Do you provide OEM or ODM service?
A2: Yes, we do. Our modular designed products facilitate customization for different customers. Every year we upgrade our products and develop new technology (e.g. ISO15118, OCPP 1.6J above), to meet the edge-leading demand of the market.
Q3: How is your production capacity?
A3: We have flexible production capacity. Besides our own factory, we also cooperate with the professional subcontract factory to provide more flexible capacity, which help us to keep a competitive business.
Q4: What power/kw to buy?
A4: First, you need to check the obc specifications of the electric car to match the charging station. Then check the power supply of the installation facility to see if you can install it. However, although Khons EV charging station are three phase and single phase compatible so even you buy a three phase charger, with only single phase power supply, it can be installed too.
Q5: How long does it take to fully charge a car?
A5: It's the battery capacity divides the actual charging power. Take BMW i4 eDrive40 for example, the batter is 83.9kw.h, charge power is 11kw, so if you have three phase power, install a 11kw charging station, actually charge at 11kw per hour, then the time to charge should be 83.9/11=7.62 hours. But usually after charging to 90%, the charging will slower. And if charge at a 7kw charging station, it should be 83.9/7=12hours.
Q6: What types of charging connector/plug to buy for AC charging?
A6: Please refer to below picture to confirm your plug type.
|
Hot Searches