- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
XGZ
-
Model Number:
-
XGZ-SSW048
-
Delivery Time:
-
25-45 days
-
Drawing design:
-
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
-
Raw material:
-
Steel
-
Color:
-
Customized Color
-
Surface treatment:
-
Painted
-
Structure type:
-
Light Steel Structre
-
Certificate:
-
CE/ISO9001
-
Main frame:
-
Sqaure tube and H section steel
-
Wall&Roof panel:
-
Sandwich panel
-
Delivery time:
-
25-60 days
-
Life span:
-
50Years
Quick Details
-
Grade:
-
steel
-
Tolerance:
-
±1%
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
XGZ
-
Model Number:
-
XGZ-SSW048
-
Delivery Time:
-
25-45 days
-
Drawing design:
-
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
-
Raw material:
-
Steel
-
Color:
-
Customized Color
-
Surface treatment:
-
Painted
-
Structure type:
-
Light Steel Structre
-
Certificate:
-
CE/ISO9001
-
Main frame:
-
Sqaure tube and H section steel
-
Wall&Roof panel:
-
Sandwich panel
-
Delivery time:
-
25-60 days
-
Life span:
-
50Years
Product Description
Compared with traditional concrete buildings, steel structure buildings use steel plates or section steel to replace reinforced concrete, which is stronger and more resistant to earthquakes. And because the component can be factory made, site installation, thus greatly reducing the construction period. Due to the reusable steel, it can be greatly reduced the construction waste, and more green environmental protection, so it is widely used in industrial buildings and civil buildings over the world.
If you want a building that has cost saving, fast erection, good quality control, high durability, steel structure buildings will be the best choice.
As the latest trend in building construction, steel structure buildings increasingly confirmed their outstanding advantages in agricultural, industrial and commercial projects such as workshop, warehouse, workshop, factory, storage, showroom, office building, supermarket, school, stadium, logistics center, etc…
Our Factory
Why choose steel structure buildings?
1. Cost Savings
Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
2. Quality Control
Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
3. Quick Erection
All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.
4. Flexibility
Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
5. Energy Efficiency
Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.
Specification
Steel structure warehouse
|
|
|
Item
|
Specification
|
|
Steel column
|
Q235,355B H section steel column
|
|
Steel beam
|
Q235,355B welded H section steel/hot-rolled H section steel
|
|
Steel purlin
|
C/Z section purlin or square tube
|
|
Downpipe
|
UPVC
|
|
Gutter
|
Stainless steel gutter/UPVC gutter
|
|
Roof material
|
Corrugated steel sheet/sandwich panel
|
|
Wall material
|
Sandwich panel and glass curtain wall
|
|
Door
|
Rolling door/Lifting door
|
|
Window
|
Aluminium window
|
Hot Searches