- Product Details
- {{item.text}}
Quick Details
-
Power:
-
305
-
Weight:
-
120000 kg
-
Model:
-
CSM120
-
Rated Producing ability(t/h):
-
120
-
Installed powder(approx)(KW):
-
305
-
Land(m):
-
31x19
-
Cold bin(m3):
-
4x9
-
Burner(MW)(Medium atomization):
-
10
-
Hot storage capacity(m3):
-
22
-
Screening decks:
-
4
-
Mixing rated capacity(kg):
-
1500
Quick Details
-
Warranty of core components:
-
1 years
-
Place of Origin:
-
Jiangsu, China
-
Brand Name:
-
YIMA
-
Power:
-
305
-
Weight:
-
120000 kg
-
Model:
-
CSM120
-
Rated Producing ability(t/h):
-
120
-
Installed powder(approx)(KW):
-
305
-
Land(m):
-
31x19
-
Cold bin(m3):
-
4x9
-
Burner(MW)(Medium atomization):
-
10
-
Hot storage capacity(m3):
-
22
-
Screening decks:
-
4
-
Mixing rated capacity(kg):
-
1500
120t/h Asphalt mixing plant Manufacturers suppliers for New road construction
1.Asphalt Mixing Plant for Sale Road Construction 120t/h used in road construction. Our company producing capacity: 80t/h,120t/h,160t/h,240t/h asphalt mixing plant.
Our asphalt mixing plant is container typed asphalt mixing plant, it's convenient for shipping and installation in the construction site.
2.
Asphalt Mixing Plant for Sale Road Construction 80t/h Consist of
1. Control room container
2. Support containers
3.Asphalt pump container
4 .Weighing and mixing system container
5. Transport container
6. Recycling powder system container
7. Hot material system container
8. Dust removal system container (this can meet the environmental requirement,the dust less than 0.075mm after handling).
9. Shaking screen sorting system container
10. Hot material hoisting machine
11. Drying and heating system
12.Gravity dust removal and air duct
13.Throwing conveyor
14. Cold material supply system
15. New powder supply system
3. Feature
1. Easy to ship and install in the construction cite.
2. Removable, can remove to other place after one road project is finished.
3. Environmental protection. No environmental harm after dust removal system.
Specification
Our product directly load on the boat . Will save the transport cost for about 50%.
1. Who are we?
We are based in Jiangsu, China. We are factory that producing Asphalt mixing plant.
2. What is your terms of payment?
A: T/T 30% in advanced,70% see the B/L copy . B.100% Irrevocable LC
3.What is your terms of delivery?
A. FOB, CFR ,CIF or as your requirement.
4. How about your delivery time?
A: Generally, it will take 30-40 days after receiving your advanced payment.
5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery