- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
Oler
-
Model Number:
-
OL-417-420
-
Size:
-
small: 37*21.5*43cm, large: 37*28*43cm
-
Surface Treatment:
-
white/black Paint
-
MOQ:
-
10PCS
-
Sample time:
-
7-10 Days
-
Description:
-
Iron
-
Function:
-
sorting organizer
-
Payment:
-
T/T
-
N.W:
-
Small: 3.27KG, Large: 3.6KG
-
Packaging:
-
5PCS/CTN
-
CTN size:
-
48.5*40*37.5CM
Quick Details
-
Functional design:
-
Multifunction
-
Dimensional tolerance:
-
<±1mm
-
Weight tolerance:
-
<±5%(Include)
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
Oler
-
Model Number:
-
OL-417-420
-
Size:
-
small: 37*21.5*43cm, large: 37*28*43cm
-
Surface Treatment:
-
white/black Paint
-
MOQ:
-
10PCS
-
Sample time:
-
7-10 Days
-
Description:
-
Iron
-
Function:
-
sorting organizer
-
Payment:
-
T/T
-
N.W:
-
Small: 3.27KG, Large: 3.6KG
-
Packaging:
-
5PCS/CTN
-
CTN size:
-
48.5*40*37.5CM
Product Description
Specification
Type
|
Under Sink Storage Holders & Racks
|
Use
|
sorting organizer
|
Material
|
iron
|
Brand Name
|
Oler
|
Model Number
|
OL-417-420
|
Product name
|
2 Tier Sliding Cabinet Basket Organizer Multifunctional Storage Organizer Holder Under Sink Pull Out Organizer for Cabinet
|
Keywords1
|
storage Rack
|
Keywords2
|
Under sink sorting Rack
|
Keywords3
|
pull out storage shelf
|
Metal
|
iron
|
Size
|
Small: 37*21.5*43cm, Large:37*28*43cm
|
N.W
|
Small: 3.27KG, Large: 3.6KG
|
Product Size
|
48.5*40*37.5cm
|
Color
|
White/black
|
Other Styles
Manufacturing Technique
Step 1: 3D Drawing
Before confirming the order, we can draw 3D drawings according to the customer's requirements.
Step 2: Molding
Different products have different molds.We will make suitable mold for mass production.
Step 3: Cutting
We will cut the raw material into the suitable size before put it in the fixture(mold) to weld.
Step 4: Auto-Bending
Our automatic bending machine can make metal wire into different shapes and sizes before put it in the fixture(mold) to weld.
Step 5: Punching
The punching process makes welding easier and can be made into different shapes.
Step 6: Spot Welding
We will put different size material into the mold,and they are held together under pressure exerted by electrodes.
Step 7: Welding
We will use welding machine,all work-pieces are held together under the pressure exerted by the electrodes.
Step 8: Automatic Welding
We will use automatic welding machine,all work-pieces are held together under the pressure exerted by the electrodes.
Step 9: Trimming
For the surplus part, we will trim it before grinding.
Step 10: Grinding
All products will be grinding to make the surface and without sharp corner scraper place.
Step 11: QC
Our QC colleagues should check every product before
products leveling control process
.
Step 12: Products Leveling Control
For provide excellent product to customer ,we have control the leveling of the product before surface treatment.
Step 13: Assembling
We will assemble some accessories, such as rubber particles and card.
Step 14: Packing
After QC inspection&assembling, we will pack according to the customer's requirements.
Step 15: Finished Products
After packaging, it will be temporarily stored in the warehouse and arranged for delivery.
Packing & Delivery
Hot Searches