- Product Details
- {{item.text}}
Quick Details
-
Use:
-
Warehouse Rack
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
HYD
-
Model Number:
-
HYD-4FWSR
-
Depth:
-
1.5-3.5mm
-
Weight Capacity:
-
500-4000 kg / layer
-
Width:
-
customized
-
Height:
-
customized
-
Product name:
-
4 Way Shuttle Storage Racking
-
Usage:
-
Warehouse Storage System
-
Color:
-
Customized
-
Structure:
-
Assembled Freely
-
Loading Capacity:
-
Up To 1500 Kg/Pallet
-
Beam:
-
Adustable
-
Surface treatment:
-
Powder Coated
-
Style:
-
Modern Customized
-
Packing:
-
Plastic Film Protection
-
Certification:
-
CE/ISO
Quick Details
-
Type:
-
Cantilevered
-
Material:
-
Steel
-
Feature:
-
Corrosion Protection
-
Use:
-
Warehouse Rack
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
HYD
-
Model Number:
-
HYD-4FWSR
-
Depth:
-
1.5-3.5mm
-
Weight Capacity:
-
500-4000 kg / layer
-
Width:
-
customized
-
Height:
-
customized
-
Product name:
-
4 Way Shuttle Storage Racking
-
Usage:
-
Warehouse Storage System
-
Color:
-
Customized
-
Structure:
-
Assembled Freely
-
Loading Capacity:
-
Up To 1500 Kg/Pallet
-
Beam:
-
Adustable
-
Surface treatment:
-
Powder Coated
-
Style:
-
Modern Customized
-
Packing:
-
Plastic Film Protection
-
Certification:
-
CE/ISO
Product Introduction
Four-way Shuttle
Rack
Warehouse Storage System
Reduce warehouse land by more than 50% and reduce labor costs by more than 30%
Product Advantages
Four-way Shuttle Warehouse Storage System Advantage
Structural Principles
Fully Automated Storage System
Produc Uesed
Scope Of Application
— Four-way Shuttle Rack >www.heavyracking.com< Warehouse Storage Racking —
Our Company
The participant and constitutor of national standard for logistics.
Our factory established in march 1993, is the pioneer in rack designing and production in china.
Exporting percentage up to 50%, products accepted and popular in japan, europe and america.
— Four-way Shuttle Rack >www.heavyracking.com< Warehouse Storage Racking —
Our Advantages
Ensure the quality of Huayide racking products
|
|
|
|
|
||||
1 / The raw material of the shelf is customized from China's large steel group of high quality carbon steel, durable and strong, to ensure the quality of the product from the source.
|
|
|
|
|
||||
2 / The shelf welding adopts dioxygen protection welding, the welding joint has good cracking resistance, small welding
deformation, beautiful forming, and does not need slag cleaning. |
|
|
|
|
||||
3 / Each column and beam of the shelf are designed by professional personnel with professional technology and cut by professional equipment, so as to ensure the accurate size of the shelf.
|
|
|
|
|
||||
4 / Professional spray before treatment, oil removal, rust removal, phosphating, powder, and then in high temperature oven baking molding, wear-resistant, rust proof.
|
|
|
|
|
— Four-way Shuttle Rack >www.heavyracking.com< Warehouse Storage Racking —
Project Case
— Four-way Shuttle Rack >www.heavyracking.com< Warehouse Storage Racking —
— Four-way Shuttle Rack >www.heavyracking.com< Warehouse Storage Racking —
FAQ
1. Q: What's your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading.
2) Lead time: normally in 20-25 days after deposit received.
3) Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received.
4) Shipping port: Shanghai / Nanjing Port
2. Q: What is your service?
1) Your inquiry related to our products or price will be replied in 12 hours.
2) Well-trained and experienced staffs to answer all your inquiries in fluent English.
3) OEM & ODM, any your customized racking we can help you to design product.
4) We have very experienced professional engineers to make best solutions.
3. Q: Do you have any reference for assembling the products ?
Yes, we offer assembly manual and we can provide you instructor engineer to your warehouse if needed.
4. Q: What's the international trading process?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance→Shipping.
5. Q: What's your advantage?
1) rush order we can fast delivery.
2) factory direct sale competitive price.
3) experienced professional engineers.
6. Q: How does charge tooling fee (cost of opening new mold)?
For the production of necessary tooling requirement, charges the cost before the first order for opening new mold, and the cost
will be partially or fully refunded after certain quantity of orders.
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading.
2) Lead time: normally in 20-25 days after deposit received.
3) Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received.
4) Shipping port: Shanghai / Nanjing Port
2. Q: What is your service?
1) Your inquiry related to our products or price will be replied in 12 hours.
2) Well-trained and experienced staffs to answer all your inquiries in fluent English.
3) OEM & ODM, any your customized racking we can help you to design product.
4) We have very experienced professional engineers to make best solutions.
3. Q: Do you have any reference for assembling the products ?
Yes, we offer assembly manual and we can provide you instructor engineer to your warehouse if needed.
4. Q: What's the international trading process?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance→Shipping.
5. Q: What's your advantage?
1) rush order we can fast delivery.
2) factory direct sale competitive price.
3) experienced professional engineers.
6. Q: How does charge tooling fee (cost of opening new mold)?
For the production of necessary tooling requirement, charges the cost before the first order for opening new mold, and the cost
will be partially or fully refunded after certain quantity of orders.
— Four-way Shuttle Rack >www.heavyracking.com< Warehouse Storage Racking —
Hot Searches