Products
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift
Mobile double mast Work climbing Platform for sale  ,single mast man scaffolding climeber lift

Mobile double mast Work climbing Platform for sale ,single mast man scaffolding climeber lift

FOB Reference Price: Get Latest Price
≥1 Sets
US $6750
≥10 Sets
US $6500
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Application:
Office Building, Hospital, School, Supermarket, Warehouse, Workshop, Park, Farmhouse, Courtyard
Type:
Mast working platform scaffolding
Place of Origin:
Shandong, China
Brand Name:
XINGDOU
Model Number:
MC450 /MC650
Load capacity:
1500-5000kg
platform length:
3m-10m/6m-30m(OEM)
platform width:
1.2m
lifting height:
150m/200m
speed:
6m/min 8-9.6m/min
overhang:
4.5m
motor power:
2*2.2kw/2*4kw
mast:
single mast/double mast
Certificate:
ISO9001/CE

Quick Details

Warranty:
1 Year
After-sale Service:
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement
Project Solution Capability:
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
Application:
Office Building, Hospital, School, Supermarket, Warehouse, Workshop, Park, Farmhouse, Courtyard
Type:
Mast working platform scaffolding
Place of Origin:
Shandong, China
Brand Name:
XINGDOU
Model Number:
MC450 /MC650
Load capacity:
1500-5000kg
platform length:
3m-10m/6m-30m(OEM)
platform width:
1.2m
lifting height:
150m/200m
speed:
6m/min 8-9.6m/min
overhang:
4.5m
motor power:
2*2.2kw/2*4kw
mast:
single mast/double mast
Certificate:
ISO9001/CE
Company Introduction

Shandong Xingdou is a professional manufacturer and designer of rack and pinion hoist and lift.
SOLUTIONS PROVIDER, TECHNOLOGY PROVIDER, MANUFACTURER !


Builder's hoist, Tower crane mini hoist, industrial lift, mast climbing platform, Mast climb working platform manufacturer.

Shandong Xingdou Equipment, the Company began to develop foreign markets 10 years ago. Since then it has exported to more than 40 countries and regions for the double mast Work climbing Platform ,single mast man scaffolding lift


Product Description

A:What is Mast Climbing Work Platform?

It is not a lift

□It is not a hoist
□It is not a ladder
□It is not scaffolding
□It is not a self-propelled areal platform

double mast Work climbing Platform ,single mast man scaffolding lift

double mast Work climbing Platform ,single mast man scaffolding lift is highly flexible,highly productive ,and highly profitable way to get personal and materials to any point on an elevation at the touch of a button.

It is fast becaming the only conpetitive way to install masonry at height.

Use of Mast Climber across many trades is growing.

B:Why to use Mast Climber ?

double mast Work climbing Platform ,single mast man scaffolding lift improve on traditional methods of acess by positioning both men and materials at the most ergonomic height creating a "workshop in the sky",which is economical ,efficient and safe.


□All models offer safety cand convenience features wihch has proven to cut labour costs in excess of 30%


□They reduce injuries and shorten production time.



□They are ideal for a wide range of jobs from new construction to repairs and refinishing on existing building

NOTE:

double mast Work climbing Platform ,single mast man scaffolding lift are very convenient ,economical and safe for working height of up to 120 meters.

For greater heights ,Square Mast Work Platforms should be used.

C:Technical data

Our double mast Work climbing Platform ,single mast man scaffolding lift are perfect for woking on facades and on tall builings since they reduce work time by up to 40% compared with other alternatives.

Within the extensive range that has available,the main certifications of the mast climber include:

□Up to 200m high and 30.6m long

□Maximum load capacity :5000kg

□Maximum speed:9.6m/min

□Suitable for surrounding the perimeter of  a building with special extensions up to 1.5m(corner ,zigzag,circular configurations)

□Limiter and incorrect load position detector.Benefits in terms of safety and increased service life of the work platform.

□Slef-erecting system.Allows the platform to be erected using the actual platform itself.

□Galvanised-steel finish.

□Modular masts compatible with various hoists systems for different uses.

Medium Range-MC 450 Technical data

For double mast Work climbing Platform ,single mast man scaffolding lift

MC450-SIGNLE
MC450-TWIN
Platform length
3.0m-10.0m
6.0m-30.m
Platform width
1.2m
1.2m
Payload
1000kg-2000kg
2000kg-4000kg
Speed
6m/nin (50 Hz area)
6m/nin (50 Hz area)
Max lifting height (attached)
150m
150m
Max freestanding height
9m
9m
Overhang
4.5m
4.5m
Tie distance
4.5m-7.5m
4.5m-7.5m
Cable guide distance
6m
6m
Mast
450(0.45m*0.45m*1.508m)
450(0.45m*0.45m*1.508m)
Rack module
5
5
Motor rating drive unit
2*2.2kw
2*2*2.2kw
Power supply
380V/50Hz
380V/50Hz

Heavy Duty Range-MC 650 Technical data

For double mast Work climbing Platform ,single mast man scaffolding lift

MC650-SIGNLE
MC650-TWIN
Platform length
3.0m-10.4m
10.3m-30.6m
Platform width
1.5m-2.7m
1.5m-2.7m
Payload
2000kg-3500kg
3500kg-5000kg
Speed
8/9.6m/min
8/9.6m/min
Max lifting height (attached)
200m
200m
Max freestanding height
9m
9m
Overhang
4.5m
4.5m
Tie distance
4.5m-7.5m
4.5m-7.5m
Cable guide distance
6m
6m
Mast
650(0.65m*0.65m*1.508m)
650(0.65m*0.65m*1.508m)
Rack module
8
8
Motor rating drive unit
2*4kw
2*2*4kw
Power supply
380V/50Hz
380V/50Hz

D:Benefits of a double mast Work climbing Platform ,single mast man scaffolding lift

□Reduces acess time by as much as 90%

□Reduces building ties by up to 80%

□Improve site security both during and after working hours

□Flexible extension platforms to contour most buildings

□Precision leveling reduces repetitive strain injuries

□Mobile chassis for quick and easy relocation

□Less damage to components compared to tradtional multi handing

□Replace trailing cable and expensive distribution points

□Reduces contract time by as much as 40%

□Weather screening improves productivity

E:Applications of double mast Work climbing Platform ,single mast man scaffolding lift

If you are working at height --a double mast Work climbing Platform ,single mast man scaffolding lift can be the answer ,whatever the application

The most safe ,stable ,woorking tools

The most cost saving tools in long-runusage

The most flexible tools during high-rise working


□New build-Refurbishment-Bridges-offical building                           □Aircraft maintenance

□Block laying                            □Brick and Masonry                            □Caulking

□Cleaning                                  □Chimney/stack Repair                      □Demolition

□Drywall                                     □EFIS                                                     □Exterior Curtain Wall

□Film Studios                            □Glazing                                                □Waterproofing

□Installation                              □Insulation                                            □Oil and Storage Tanks

□Overhead Elecrical work       □Painting                                               □Pipe work

□Plastering                                □Pointing                                              □Peplace windows

□Restoration                             □Windows cleaning

Workshop

Self developed / Hot Sale double mast Work climbing Platform ,single mast man scaffolding lift with rack and mast section can be customized according to customers'requirements(drawing, specifications and so on).

Packing&Shinping

Self developed / Hot Sale double mast Work climbing Platform ,single mast man scaffolding lift with rack and mast section is the most important matter, but we can not ignore the importance of package. Well package can protect the product from crash, rust ,mess and so on. It is easy for our clients to identify different spare parts, easy loading and unloading. We pay much more attention to the details...

Showing case


FAQ

Welcome to inquire and pay a visit to us, we are manufacturing experts of construction building hoist!

1. After get your inquiry , will act within 12 hours

2. After confirming your exact requirement, we will give solution within 24 hours

3. Our salesman a all experienced and experts

4. We have strong sales support technicians team

5. We have strong manufacturing and quality control team

6. We have strong aftersale service team

APP
Post My RFQ
WhatsApp
+86-17326049340