- Product Details
- {{item.text}}
Quick Details
-
Voltage:
-
220V/380V/440V
-
Power:
-
2.2KW
-
Dimension(L*W*H):
-
Customized
-
Weight:
-
200
-
Product name:
-
1000l cstr continuous stirred tank reactor
-
MOQ:
-
1 piece for 1000l cstr continuous stirred tank reactor
-
Surface treatment:
-
mirror finish or matt finish
-
Material:
-
stainless steel 304 or 316L
-
Application scope:
-
dairy,food,beverage,cosmetic
-
Packing:
-
plywood or customized
-
Delivery details:
-
Usually within 20 days after payment
-
Heating method:
-
Electric Heating
Quick Details
-
Capacity:
-
20000, 50-10000L
-
Place of Origin:
-
Shanghai, China
-
Brand Name:
-
ZH
-
Voltage:
-
220V/380V/440V
-
Power:
-
2.2KW
-
Dimension(L*W*H):
-
Customized
-
Weight:
-
200
-
Product name:
-
1000l cstr continuous stirred tank reactor
-
MOQ:
-
1 piece for 1000l cstr continuous stirred tank reactor
-
Surface treatment:
-
mirror finish or matt finish
-
Material:
-
stainless steel 304 or 316L
-
Application scope:
-
dairy,food,beverage,cosmetic
-
Packing:
-
plywood or customized
-
Delivery details:
-
Usually within 20 days after payment
-
Heating method:
-
Electric Heating
Drawings
How to choose
Effective Volume (L)
|
Dimeter of Tank (mm)
|
Jacketed Dimeter of Tank (mm)
|
Motor Power(kw)
|
Reducer Model
|
50
|
500
|
600
|
0.6-1.1
|
M3
|
100
|
550
|
650
|
1.1-1.5
|
M4
|
500
|
900
|
1000
|
2.2
|
M6
|
2000
|
1400
|
1500
|
4
|
M8
|
5000
|
1600
|
1700
|
7.5
|
BLB7.5-4-13
|
8000
|
2000
|
2100
|
15
|
BLB7.5-4-13
|
Product Characteristics
|
|
|
|
|
||||
1
|
Heating need for external, such as boiler and cooling device or other external
|
|
|
|
||||
2
|
And the material contact at the pot body and parts are made of OCr18Ni9 or 1Cr18Ni9Ti stainless steel plate
|
|
|
|
||||
3
|
With less investment, fast operation, high efficiency
|
|
|
|
||||
4
|
With heating, high temperature resistance, corrosion resistance, health, no pollution
|
|
|
|
||||
5
|
The heat transfer effect is better than enamel reaction kettle, heating and cooling rate is rapid
|
|
|
|
||||
6
|
The steam valve and the cooling valve can not start at the same time, the steam pipe is not allowed to hammer
and collision
|
|
|
|
Application Field
Q: How long have you worked in this field?
A: Over 15 years.
Q:What's the delivery time?
A: Standard products will be 10-15days after receive your down payment or full payment.
Q: Can your factory produce products according to our drawings or samples?
A: Yes, of course we can.
Q: Are you manufacturer or trading company ?
A: We are a professional manufacturer.
Q: What is your factory's biggest advantage?
A: Technology is our core competitiveness.