Products
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project
Double Membrane Biogas Storage Balloon for CHP Project

Double Membrane Biogas Storage Balloon for CHP Project

FOB Reference Price: Get Latest Price
≥1 Sets
US $5000
≥2 Sets
US $4950
≥3 Sets
US $4800
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Nitrogen Content (%):
1
Sulphur Content (%):
1
Brand Name:
JCWY
Model Number:
Customized
Place of Origin:
Shandong, China
Calory (J):
22600000
Type:
Double Membrane
Install:
Easy
Product Name:
Biogas Digester Storage Bag
Feature:
Movable
Material:
PVC
Lifespan:
8-15years
Color:
White
Capacity:
Customer Request
Thickness:
0.5-2mm
Surface Treatment:
Spray Paint

Quick Details

Application:
Chemical
Hydrogen Content (%):
1
Methane Content (%):
60
Nitrogen Content (%):
1
Sulphur Content (%):
1
Brand Name:
JCWY
Model Number:
Customized
Place of Origin:
Shandong, China
Calory (J):
22600000
Type:
Double Membrane
Install:
Easy
Product Name:
Biogas Digester Storage Bag
Feature:
Movable
Material:
PVC
Lifespan:
8-15years
Color:
White
Capacity:
Customer Request
Thickness:
0.5-2mm
Surface Treatment:
Spray Paint
Product Description
Specification
Device Name
Flexible Double Film Biogas Holder
Process Type
Internal Circulation Anaerobic Reactor—IC
Gas Cabinet Specifications
According to Customers
Applicable Industry
Biogas and Waste Water
Installation Duration
Depends on the Size of Project
Material Quality
PES/PVC/PDFE
Control Mode
Concentrated Integration Pressure Automatic Control
Advantage
Easy to Install, Recycling, Corrosion Resistance, Automatic Control
Field of Application
Sewage and Waste Water
Our Advantages:
1. Less investment, small footprint and can be built directly on the ground without digging;
2. The main components are anti-corrosion special flexible film, do not need any anti-corrosion treatment measures;
3. Light weight and low infrastructure requirements;
4. Short installation period and low construction cost;
5. Manufactured in our own factory , quality is guaranteed. The product is also soft enough to transport.

APP
Post My RFQ
WhatsApp
+86-17326049340