- Product Details
- {{item.text}}
Quick Details
-
EINECS No.:
-
N/M
-
Place of Origin:
-
China
-
Brand Name:
-
Go green
-
Model Number:
-
GAF02
-
Type:
-
Liquid
-
Appearance:
-
Liquid at nomal temperature
-
Package:
-
4kg bag & 30kg bucket
Quick Details
-
CAS No.:
-
N/M
-
Other Names:
-
Glue
-
MF:
-
N/M
-
EINECS No.:
-
N/M
-
Place of Origin:
-
China
-
Brand Name:
-
Go green
-
Model Number:
-
GAF02
-
Type:
-
Liquid
-
Appearance:
-
Liquid at nomal temperature
-
Package:
-
4kg bag & 30kg bucket
Pourable asphalt crack filler for pavement cracks repair for sale
Product Description
Go Green Pourable Asphalt Crack Filler is a safe, easy-to-use, modified asphalt emulsion crack filler designed for maintenance of asphalt and concrete pavements. It prevents cracks from becoming potholes by sealing them from the weather’s destructive freeze and thaw cycles.
Features:
- Flexible to allow for expansion and movement
- Ideal for cracks up to 1.27cm wide
- Cracks 3cm–5cm can be filled by mixing Go Green Asphalt Crack Filler with sand
- Long lasting protection against ingress of water
- Suitable for inside and out
- Excellent adhesion
User Guide
Cracks in asphalt can lead to water ingress, erosion and accelerated deterioration of the surface. This silicon based product makes crack repairs easy. Simply decant the liquid into a watering can (or any spouted can) and pour into the crack. Usage depends upon crack size, 1kg crack filler can repair 10~30m cracks.
Cracks in asphalt can lead to water ingress, erosion and accelerated deterioration of the surface. This silicon based product makes crack repairs easy. Simply decant the liquid into a watering can (or any spouted can) and pour into the crack. Usage depends upon crack size, 1kg crack filler can repair 10~30m cracks.
Notice:
1. Just clean crack, shake, snip open and squeeze into crack. cracks should stay no water, dirt, dust, grease and other contaminants.
2. It will be no rain, no snow, the effect of the permeability depending on weather, should be fully dry within 24 hours and ready to seal over.
3. Pour crack filler slowly into crack and Squeegee excess filler into crack..
4. Construction temperature -40℃~50℃. Storage period of 12 months
1. Just clean crack, shake, snip open and squeeze into crack. cracks should stay no water, dirt, dust, grease and other contaminants.
2. It will be no rain, no snow, the effect of the permeability depending on weather, should be fully dry within 24 hours and ready to seal over.
3. Pour crack filler slowly into crack and Squeegee excess filler into crack..
4. Construction temperature -40℃~50℃. Storage period of 12 months
Application
It is ideal for
roads, highways, parking lots, and driveways
. When properly applied, Go Green cold pourable crack filler can be driven over within 30 minutes without tracking.
Package
Certifications
Hot Searches