- Product Details
- {{item.text}}
Quick Details
-
Oiled or Non-oiled:
-
Slightly Oiled
-
Invoicing:
-
by actual weight
-
Place of Origin:
-
China
-
Outer Diameter:
-
21.3 - 610 mm
-
Thickness:
-
2mm-45mm
-
Grade:
-
AISI1541
-
Delivery Time:
-
7 days for ex-stock
-
Quality control:
-
chemical,mechanical, dimension
-
Mill's certificate:
-
EN10204 3.1 or 3.2
Quick Details
-
Section Shape:
-
Round
-
Surface Treatment:
-
varnished
-
Tolerance:
-
±10%
-
Oiled or Non-oiled:
-
Slightly Oiled
-
Invoicing:
-
by actual weight
-
Place of Origin:
-
China
-
Outer Diameter:
-
21.3 - 610 mm
-
Thickness:
-
2mm-45mm
-
Grade:
-
AISI1541
-
Delivery Time:
-
7 days for ex-stock
-
Quality control:
-
chemical,mechanical, dimension
-
Mill's certificate:
-
EN10204 3.1 or 3.2
ASTM A519 Gr.1541 GB40Mn2 DIN1.127 JIS SMN438 Gost 35GL BS120MN6 Seamless Alloy Steel Pipe
Both Sae 1541 and 1026 are iron alloys, but due to their specific chemical composition, they have different mechanical properties. SAE 1541 Pipe has Brinell Hardness within the range of 210-220 whereas for SAE 1026, it is within 140-160. Similarly, the min tensile strength of 1541 is between 720-790 MPa, and min yield strength is between 390-680 MPa. However for SAE 1026 material, the min tensile strength falls within the range of 500-550 MPa, and min yield strength is between 270-470 MPa.
Equal standards
AISI |
DIN |
JIS |
GB |
GOST |
BS |
1541 |
1.127 |
JIS SMN438 |
40MN2 |
35GL |
120MN6 |
Chemical composition(%) |
|||||||
C |
Si |
Mn |
Cr |
Mo |
P |
S |
Ni |
0.36-0.44 |
0.02 |
1.35-1.65 |
0.02 |
0.02 |
0.03 |
0.05 |
0.02 |
Specification
Standard |
ASTM A519/ASME 519 |
Outer diameter |
1/2” to 60” |
Wall thickness |
2mm to 45mm |
Length |
SRL, DRL, 6M, 12M. |
Outside coating |
Black painting, varnished, FBE,3PP, 3PE,3LPE |
Form |
Round, square, rectangle |
Type |
Seamless, welded, ERW |
Packing |
Standard seaworthy packing |
Marking |
Logo + specification + heat no. |
Quality control |
Chemical, mechanical, UT, x-ray, dimension and visual |
Mill’s certificate |
EN10204 3.1 or 3.2 |
Lead time |
7 days for ex-stock, 30 days for fresh production |