- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Shandong, China
-
Voltage:
-
380v
-
Dimension(L*W*H):
-
6000*1400*2400
-
Weight:
-
512 KG
-
Function:
-
Water Washing Machine
-
Application scope:
-
Beverage Shops
-
Name:
-
Vegetables and Fruits Washer
-
Material:
-
SUS 304
-
COLOR:
-
Silver
-
Advantage:
-
Water Recycle
-
Feature:
-
High Efficiency Easy Operate
-
Use:
-
Cleaning fruits and vegetables
-
MOQ:
-
1 Set
-
PACKAGE:
-
Standard Wooden Case
Quick Details
-
Raw material:
-
Water
-
Model Number:
-
QX-600/800/1000/2000
-
Brand Name:
-
Innovaster
-
Place of Origin:
-
Shandong, China
-
Voltage:
-
380v
-
Dimension(L*W*H):
-
6000*1400*2400
-
Weight:
-
512 KG
-
Function:
-
Water Washing Machine
-
Application scope:
-
Beverage Shops
-
Name:
-
Vegetables and Fruits Washer
-
Material:
-
SUS 304
-
COLOR:
-
Silver
-
Advantage:
-
Water Recycle
-
Feature:
-
High Efficiency Easy Operate
-
Use:
-
Cleaning fruits and vegetables
-
MOQ:
-
1 Set
-
PACKAGE:
-
Standard Wooden Case
Product Description
Industrial Apple Washing Machine Air Bubble Vegetable Cleaning Washing Fruit Washer Potato Bubble Cleaning Machine
|
|
|
|
|
FAQ
Q: What methods of payment are acceptable?
A: FOB, CFR & CIF optional; It’s mainly depend on client’s requirement; Accepted payment types: T/T, L/C;
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Contact Us
Hot Searches