- Product Details
- {{item.text}}
Quick Details
-
Type:
-
Single slope or double slop;
-
Color:
-
Customized
-
frame:
-
metal/steel structure
-
Wall and Roof:
-
50mm/75mm/100mm/150mm thick EPS/Rockwool/PU sandwich panel
-
Structure:
-
Steel Structure Frame Welded
-
Project Solution Capability:
-
graphic design
Quick Details
-
Place of Origin:
-
Shanghai, China
-
Brand Name:
-
arched house
-
Model Number:
-
prefab cabin log
-
Type:
-
Single slope or double slop;
-
Color:
-
Customized
-
frame:
-
metal/steel structure
-
Wall and Roof:
-
50mm/75mm/100mm/150mm thick EPS/Rockwool/PU sandwich panel
-
Structure:
-
Steel Structure Frame Welded
-
Project Solution Capability:
-
graphic design
dome house prefabricated/eps dome house/camping pod arched home
Material list | |||
ITEM | NAME | SIZE | UNIT |
Bottom structure | Channel Steel | 8# |
KG |
Composite Panel | 18mm | SET | |
Laminate Floor | m2 | ||
Wall | Square Tube | 30*50*2mm | PCS |
50*50*3mm | PCS | ||
Single Plate | 0.4 | m2 | |
Rock Wool Insulation Board | Thickness: 50mm | m2 | |
Mulitilayer Board | Thickness: 9mm | SET | |
PVC Buckle | m2 | ||
Glable Wall | Cladding Panel | m2 | |
OSB Board | m2 | ||
Rock Wool Insulation Board | 50mm | m2 | |
Window&Door | Aluminum Alloy Window | 2100*3600mm | PC |
1200*1500mm | PC | ||
Aluminum Alloy Door | 2100*3600mm | PC | |
Stainless Steel Edge | m2 | ||
Electrical Work | Socket | PC | |
Ceiling Light | PC | ||
Switch | PC | ||
Lantern | SET | ||
Wire | Unit | ||
Package | 20GP for 2UNITS & 40HQ for 5UNITS | PCS |
Shanghai XingFeng ColorBoard Light Steel Structure Co., Ltd established in 2003.We also have one trading company Shanghai JieFeng International Trade Co., Ltd. Our factory runs pretty well for the last 10 years. Professional manufacturer and supplier of steel structure, structure maintenance parts, prefab house and mobile house. We are member unit of Shanghai Metal Construction Association.
Our products mainly engaged 5 parts. 1st steel structure factory/warehouse/workshop;2nd Light steel villa, office, dormitory;3rd prefab house, module building;4th Container house, flat pack mobile house;5th customized non-standard buildings. For now we have established long-term partnership with clients from New Zealand, Australia, Uruguay, Spain, Myanmar, Nepal, Congo, Nigeria, Colombia, India, New Caledonia and many others.
Due to our advanced management, excellence mechanism, effective and efficient resource integration system, low-cost expansion capability, high-tech core technology and advantages of global marketing network, all that makes our company laid the cornerstone of sustainable development.
We have established one solid foundation in the past decade and we believe there must be booming developing in coming decades. Shanghai Xingfeng will keep the culture soul of "Integrity-cooperation-service" and devote ourselves to developing energy-saving buildings. We expect to establish long and strong relationship with you on mutual benefits. Build up green livable homes, to be your dream house.
Q1: Could you please design a new and unique light steel prefab house for me?
A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but landscape design! Besides, detailed drawings and 3D models are surely included. One-stop service is our outstanding superiority with no doubt.
Q2: What should I provide to build a light steel prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don’t have any. Simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you’ll possess an amazing design.
Q3: How could I ensure the cost of building a light steel prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
Q4: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.