- Product Details
- {{item.text}}
Quick Details
-
Max. lifting weight:
-
800 ton
-
Max. lifting moment:
-
11000 t.m
-
Max. lifting height:
-
178 m
-
Engine model:
-
OM502LA.E3A/3
-
Engine power:
-
420/1800 kw/rpm
-
Superlift mast:
-
42 m
-
Max. length of heavy boom:
-
141 m
-
Max. length of light boom:
-
150 m
-
Gradeability:
-
30%
-
Track demension:
-
8600 * 10500 * 1500 mm
Quick Details
-
Weight (KG):
-
800000
-
Marketing Type:
-
Hot Product
-
Place of Origin:
-
China
-
Max. lifting weight:
-
800 ton
-
Max. lifting moment:
-
11000 t.m
-
Max. lifting height:
-
178 m
-
Engine model:
-
OM502LA.E3A/3
-
Engine power:
-
420/1800 kw/rpm
-
Superlift mast:
-
42 m
-
Max. length of heavy boom:
-
141 m
-
Max. length of light boom:
-
150 m
-
Gradeability:
-
30%
-
Track demension:
-
8600 * 10500 * 1500 mm
China's first ultra-long multi-diameter boom combination; the boom with ultra-wide arm working condition can be up to 171 + 7m,
the maximum lifting height is 180m; the overall coverage of 140m 3MW wind turbines, 160m 2.0MW ~ 2.5MW wind turbines .
The wind power of the conventional boom can reach up to 159 + 7m, covering a total of 140m of 2.0MW ~ 2.5MW wind turbines.
Using the upper and lower car separation technology, the maximum transport weight of a single piece is 40t, which meets global
road transportation; lightweight, modular design, fully mechanized disassembly and assembly, unique wind power pole head
structure, the longest wind power can be completed within 24 hours Assembly under working conditions.
the maximum lifting height is 180m; the overall coverage of 140m 3MW wind turbines, 160m 2.0MW ~ 2.5MW wind turbines .
The wind power of the conventional boom can reach up to 159 + 7m, covering a total of 140m of 2.0MW ~ 2.5MW wind turbines.
Using the upper and lower car separation technology, the maximum transport weight of a single piece is 40t, which meets global
road transportation; lightweight, modular design, fully mechanized disassembly and assembly, unique wind power pole head
structure, the longest wind power can be completed within 24 hours Assembly under working conditions.
item
|
value
|
Feature
|
Other
|
Applicable Industries
|
Garment Shops, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Food & Beverage Factory, Retail, Construction works , Energy & Mining, Food & Beverage Shops
|
Weight (KG)
|
800
|
Video outgoing-inspection
|
Provided
|
Machinery Test Report
|
Provided
|
Marketing Type
|
Hot Product
|
Warranty of core components
|
1 Year
|
Core Components
|
PLC, Engine, Bearing, Gearbox, Motor, Pressure vessel, Gear, Pump
|
Condition
|
New
|
Place of Origin
|
China
|
Warranty
|
1 Year
|
Max. lifting weight
|
800 ton
|
Max. lifting moment
|
11000 t.m
|
Max. lifting height
|
178 m
|
Engine model
|
OM502LA.E3A/3
|
Engine power
|
420/1800 kw/rpm
|
Superlift mast
|
42 m
|
Max. length of heavy boom
|
141 m
|
Max. length of light boom
|
150 m
|
Gradeability
|
30%
|
Track demension
|
8600 * 10500 * 1500 mm
|
Hot Searches