- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
deou
-
Dimension(L*W*H):
-
customized
-
Weight:
-
350 KG
-
Working Temperature Range:
-
140 - 170 ℃
-
Power Source::
-
Natural Gas
-
Voltage::
-
220V
-
Core Components::
-
Motor, Engine
-
Working Temperature Range::
-
5 - 10 ℃
-
Heating Area::
-
1.35M2
-
Fuel::
-
Gas
-
Work Temperature::
-
140-170℃
-
Marketing Type::
-
New Product 2020
-
Type::
-
Immersion Heater
-
Key Selling Points::
-
Long Service Life
Quick Details
-
Type:
-
circulation heater
-
Power Source:
-
Electric
-
Voltage:
-
110v-690v
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
deou
-
Dimension(L*W*H):
-
customized
-
Weight:
-
350 KG
-
Working Temperature Range:
-
140 - 170 ℃
-
Power Source::
-
Natural Gas
-
Voltage::
-
220V
-
Core Components::
-
Motor, Engine
-
Working Temperature Range::
-
5 - 10 ℃
-
Heating Area::
-
1.35M2
-
Fuel::
-
Gas
-
Work Temperature::
-
140-170℃
-
Marketing Type::
-
New Product 2020
-
Type::
-
Immersion Heater
-
Key Selling Points::
-
Long Service Life
1.Asphalt pavement heating plate Using liquefied gas fuel easy operate strong resistance mechanical shock thermal shock
2.road repair machine simplifies repair process repair speed fast entire repair process takes 20 min
3.Recycled paving equipment good repair quality no weak joints ensure repaired road original
Model | do-78 |
Size | 1660*1160*1200MM |
Fuel | Gas |
Heating Type | Blue Flame |
Heating Area | 1.35M2 |
Heating Time | 8-15Min |
Work Temperature | 140-170℃ |
Ignition System | Solar Electronic |
Heating Depth | 3-5CM |
Product Keywords | Infrared Asphalt Heating Plate |
1.24 hours on line service, support Chinese, English, Spanish, French, German, Russian ,technical guidance.
2. When meets machine failure problem, our factory will ensure that the problem is solved within 1 hour
3.Povide machine install video.
4.Provide logistics information, like shipping by sea, shipping by express DHL, FEDEX delivery, real-time tracking service.
5.If machine is broken ,Non-human causes,the new machine will be provided or new parts will be provided.