- Product Details
- {{item.text}}
Quick Details
-
Power Source:
-
Electric, Gas, Manual
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
OEM
-
Model Number:
-
BTC-knob
-
Material:
-
zinc alloy
-
Color:
-
Customized
-
Usage:
-
Kitchen cooker equipment
-
Size:
-
Custom
-
Product name:
-
Stove control knob
-
Finish:
-
Brushed Nickle, Chrome plating and so on
-
Process:
-
Die Casting+Machining+surface
Quick Details
-
After-sales Service Provided:
-
Return and Replacement
-
Warranty:
-
1 Year
-
Application:
-
Outdoor, Hotel, Household
-
Power Source:
-
Electric, Gas, Manual
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
OEM
-
Model Number:
-
BTC-knob
-
Material:
-
zinc alloy
-
Color:
-
Customized
-
Usage:
-
Kitchen cooker equipment
-
Size:
-
Custom
-
Product name:
-
Stove control knob
-
Finish:
-
Brushed Nickle, Chrome plating and so on
-
Process:
-
Die Casting+Machining+surface
Item Name
|
OEM Die casting zinc alloy gas oven range control d shaft knob
|
Item No.
|
BTC-knob
|
Material
|
Zinc alloy
|
Size
|
Ф60.5mm*H39mm, Valve stem: Ф8mm OR custom
|
Finish
|
Brushed Nickle, chrome plating, and so on.
|
MOQ
|
100 pcs, we provide support for new customers and accept small orders
|
Package
|
1) 1pcs product in 1 polybag.
2) Standard packaging with carton box and pallet or we can custom according to clients.
|
Capacity
|
300000 pieces/month
|
Products Show
FAQ
Q1:What certification has your company passed?
A: Our company has passed the ISO 9000 certification, SGS certification.
Q2: How long is the mold development cycle?
A:It's usually 30 to 60 days.
Q3:How long is the service life of the mold?
A:50,000 to 100,000 modules.
Q4: Does the facility provide OEM and ODM services?
A:Yes.
Q5: What are the ways of surface treatment in the factory?
A: Electroplating, shot blasting, electrolysis, spraying, oxidation, passivation, PVD,
electrophoresis, etc
Q6:What kind of material does the product material classification have?
A:Aluminum alloy castings, zinc alloy castings, stainless steel punching parts, stainless steel
pipe fittings, stainless steel castings, cast iron parts, injection molding parts, copper parts, etc
Q7:How long is the cycle time of mass production?
A:30 to 60 days.
Q8:What is the port of shipment?
A:Ningbo Port and Shanghai Port.
*Contact me with any hesitate when you are in trouble of our products.
Hot Searches