- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
JieKai
Quick Details
-
Applicable Industries:
-
PCB Process, Electroplating, Coating Process, Spray, Etching, Sewage Treatment, Waste Water And Gas Treatment, Circulation
-
Weight (KG):
-
50
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
JieKai
FAQ
Q:Are you a factory or trading company?
A: Our company is a professional manufacturer and trader that is concerned with the design,development and production more than 15 years.
Q:How can i get the quotation ?
A:Please help to send the pump flow,head,power,caliber,voltage,frequency and quantity so that we could give you an accurate quotation.
Q. What is your delivery time?
A: We have the stock with the sample order,7-15 days for container order. ( Busy season may need more days )
Q:What is your warranty ? What do we do in case of problems?
A:One year quality warranty is provided.In case of our quality problem, we will provide replacement by international courier.Immediate delivery of replacement parts with available in stock, and if not stocking, the time should be depending on
material ordering time which is normally 10-15 days.
Q.How can we install the pump?
A:We have professional installation team and could provide one stop installation guide.
Q:What is your payment terms?
A:Normally, 30% - 50% of total amount by T/T as deposit and balance before delivery.
A: Our company is a professional manufacturer and trader that is concerned with the design,development and production more than 15 years.
Q:How can i get the quotation ?
A:Please help to send the pump flow,head,power,caliber,voltage,frequency and quantity so that we could give you an accurate quotation.
Q. What is your delivery time?
A: We have the stock with the sample order,7-15 days for container order. ( Busy season may need more days )
Q:What is your warranty ? What do we do in case of problems?
A:One year quality warranty is provided.In case of our quality problem, we will provide replacement by international courier.Immediate delivery of replacement parts with available in stock, and if not stocking, the time should be depending on
material ordering time which is normally 10-15 days.
Q.How can we install the pump?
A:We have professional installation team and could provide one stop installation guide.
Q:What is your payment terms?
A:Normally, 30% - 50% of total amount by T/T as deposit and balance before delivery.
|
|
|
|
|
Hot Searches