- Product Details
- {{item.text}}
Quick Details
-
Model:
-
WT-FX1350
-
Film width (cm):
-
120-130cm
-
Ploughing width (cm):
-
135
-
Ploughing depth (cm):
-
8-20
-
Tractor Power (HP):
-
25-40
-
Working Speed:
-
2000m^2/hr
-
Ridges formed:
-
2
-
Irrigation pipes paved:
-
2
-
Weight (KG):
-
350kg
-
Certification:
-
CE
Quick Details
-
Place of Origin:
-
Henan, China
-
After-sales Service Provided:
-
Online support
-
Name:
-
plastic mulch laying machine
-
Model:
-
WT-FX1350
-
Film width (cm):
-
120-130cm
-
Ploughing width (cm):
-
135
-
Ploughing depth (cm):
-
8-20
-
Tractor Power (HP):
-
25-40
-
Working Speed:
-
2000m^2/hr
-
Ridges formed:
-
2
-
Irrigation pipes paved:
-
2
-
Weight (KG):
-
350kg
-
Certification:
-
CE
Plastic mulch laying machine / plastic mulch layer with tractor trailed
Features of Plastic mulch laying machine / plastic mulch layer with tractor trailed
Use in no tillage in hilly land of plains, one-time mill no-tillage fertilizing, laying irrigation, covering press and many other works.
Function of Plastic mulch laying machine / plastic mulch layer with tractor trailed
1 . Rotary tillage
Loosen the effective and concrete for crop growth.
2 . fertilization
And deep coverage, efficiency focus is on improving utilization rate of fertilizer application.
3 . mulch laying
Effective use of sunlight, holding moisture.
4 . Ridge
Improving the cultivation situation, making full use of water and fertilizer.
5 . drip irrigation under mulch laying
Save water, reduce manual labor
Technical parameters of Plastic mulch laying machine / plastic mulch layer with tractor trailed
Model |
WT -FX1250 |
WT - FX1350 |
Tractor Power (HP) |
20-30 |
25-40 |
Working Speed |
2000 m^2/h |
2000 m^2/h |
Film width (cm) |
120-130 |
120-130 |
Ploughing width (cm) |
125 |
135 |
Ploughing depth (cm) |
8-18 |
8-20 |
Ridges formed |
2 |
2 |
Irrigation pipes paved |
2 |
2 |
Dimension (L*W*H cm) |
180*155*120 |
180*142*120 |
Weight (KG) |
350 |
350 |
1. Qual i ty Gu a rantee |
one-year guarantee period for each machine |
2.Pre t esting before forwarding |
All machines will be pre t ested to make sure it will be received in good condition |
3.Operation Video
|
We will provide you operation video and detailed instructions to install and you can make full use of the machine |
4.Full Technical service |
Engineer is ready to providing you our full-process tracing
|
1. Qual i ty Gu a rantee |
one-year guarantee period for each machine |
2.Pre t esting before forwarding |
All machines will be pre t ested to make sure it will be received in good condition |
3.Operation Video
|
We will provide you operation video and detailed instructions to install and you can make full use of the machine |
4.Full Technical service |
Engineer is ready to providing you our full-process tracing
|